Similar Projects
ERFO 7 - Point Abbaye Road
Infrastructure
Bidding
$700,000 CJ est. value
Covington Township, MI 49946

ERFO 7 - Point Abbaye Road
Infrastructure
Bidding
$700,000 CJ est. value
Covington Township, MI 49946

As-Needed Shoulder Gravel Maintenance-Baraga and Houghton Co
Term Contract
Post-Bid

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Up to 204.66 Lnmi of Hot Mix Asphalt Crack Treatment
Results

Marina Improvements Project
Infrastructure
Bidding
$200,000 CJ est. value
Lanse, MI 49946

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Road Repair - Skip Paving, HMA
Infrastructure
Results

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

7.54 Mi of Hot Mix Asphalt Overlay, Crushing and Shaping Shoulders, Drainage Improvements, Guardrail, Signing and Pavement Markings
Infrastructure
Results
MI

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

Lake Ottawa & Black River Campground Road Reconstruction
Term Contract
Results
$500,000 to $1,000,000 est. value

Hot Mix Asphalt Crack Treatment and Overband Crack Filling on Various State Trunkline Routes
Infrastructure
Post-Bid
$341,000 est. value
L'Anse, MI

Hot Mix Asphalt Resurfacing Carpool Parking
Infrastructure
Results
MI

Last Updated 09/15/2022 06:02 PM
Project Title

ERFO 8 and 9 - Sutinen Road and Payne Road

Physical Address View project details and contacts
City, State (County) Lanse, MI 49946   (Baraga County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Placing an aggregate surface course, grading, and ditching. Bid security shall be furnished in accordance with the Instructions to Bidders. The Bid Bond or certified check payable to Owner shall be in an amount no less than 5% of the maximum bid as a guarantee, that if the Bid is accepted, the Bidder will execute and file the Contract, Performance and Payment Bonds, and Insurance Certification, as required by the Contract Documents within (10) days after the Notice of Award and Bid may not be withdrawn for a period of 30 days after the bid deadline. The Owner reserves the right to waive any informality or to reject any or all bids. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Minimum wages to be paid on the project shall be in accordance with the prevailing wage rates included in the bidding documents. This is a Federally Funded project. The Contractor and Subcontractors on this project must comply with Tribal Employment Rights Office (TERO) preference, HUD contract provisions 24CFR part 85.36(i), the Davis Bacon Act, Federal Occupational Safety and Health Act and Department of Labor Standards and Regulations as set forth in the Contract Bid Documents.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents