Similar Projects
Maple Street Industrial Addition
Addition, Demolition, Renovation, Infrastructure - 58,600 SF
Conception
$5,000,000 CJ est. value
Bellingham, MA 02019

Boylston Street Townhouse Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Brookline, MA 02445

Holmes Street Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
North Quincy, MA 02171

Holmes Street Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
North Quincy, MA 02171

Flooring Replacements at Broadmeadow, Eliot, and Pollard
Renovation
Bidding
$369,261 CJ est. value
Needham, MA 02492

John D. Hardy Elementary School / Wellesley
Demolition, LEED Certification, New Construction, Infrastructure - 81,390 SF
Post-Bid
$57,300,000 CJ est. value
Wellesley, MA 02482

John D. Hardy Elementary School / Wellesley
Demolition, LEED Certification, New Construction, Infrastructure - 81,390 SF
Post-Bid
$57,300,000 CJ est. value
Wellesley, MA 02482

Oak Grove Playground Renovation Project
Renovation
Results
$127,000 est. value
Millis, MA 02054

New Hanlon Elementary School - Sub Bid
New Construction - 226,029 SF
Results
$160,000 est. value
Westwood, MA 02090

Stargazer Hill Farm Arena
New Construction - 5,280 SF
Construction
$14,000 est. value
Plainville, MA 02762

Gillette Stadium Renovation
Addition, Renovation, Infrastructure
Construction
$225,000,000 CJ est. value
Foxborough, MA 02035

Massapoag Street Residential Subdivision
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
S Weymouth, MA 02190

Factory Square Redevelopment
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Franklin, MA 02038

The Learning Experience / Franklin
New Construction, Infrastructure - 5,250 SF
Conception
$2,000,000 CJ est. value
Franklin, MA 02038

Brookline Ice Skating Rink
Demolition, New Construction
Design
$5,000,000 CJ est. value
Brookline, MA 02445

Last Updated 07/07/2023 04:35 PM
Project Title

Canton Field Complex Bathroom Facility JFK Elementary School - GC

Physical Address View project details and contacts
City, State (County) Canton, MA 02021   (Norfolk County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Elementary School, Misc. Recreational, Park/Playground, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $842,145 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 7, 2023, project was awarded toPage Building Construction , awarded amount is $1,061,970.00. JFK Elementary School, Canton - Field Complex Bathroom Facility. The work includes but is not limited to site work and utilities, concrete foundations, concrete masonry unit exterior and interior walls, structural steel framing, wood framing and sheathing, dampproofing, weather barriers and sealants, thermal insulation, shingle roofing, metal and wood doors, overhead coiling door, fiberglass windows, solar tubs, gypsum drywall board finishes, exterior and interior painting, toilet and bath accessories, plumbing and plumbing fixtures, HVAC heating and exhaust, electrical, lighting, and fire alarm system. Contractor Qualification: DCAMM Certificate General Bidders must be DCAMM certified in the category of General Building Construction to be considered an eligible bidder. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated cost of the work is $ 975,890. All questions and requests for interpretations must be submitted in writing by the Filed Sub-Bidders by 3:00 P.M., Friday, April 31, 2023 A. In general, the Contractor shall supply all material, labor, equipment, insurance, temporary protection, tools and appliances necessary for the proper completion of the Work as described in the Plans and Specifications, in accordance with good construction practice, and as required by the materials manufacturers. B. Supply all shoring and protection necessary to protect the occupants, building area, building systems, and landscape areas. All means and methods are the responsibility of the Contractor. The Contractor is solely responsible for safety on the job site. C. All work related to the construction for a new complete and functional Bathroom Facility includes but is not limited to: 1. Sitework, erosion control, site preparation, earthwork excavation and backfill, paving, and water, sewer, sanitary, storm and electrical utilities. 2. Reinforced concrete footings, foundations, piers and floor slabs. 3. Exterior insulated concrete masonry units and interior concrete masonry units bearing walls. 4. Structural Steel columns, lintels and connections. 5. Wood framed walls, ceilings and roof structures. 6. Dampproofing, Vapor Barriers, Weather Barriers, and Sealants. 7. Thermal Insulation 8. Fiberglass asphalt shingle roof covering and sheet metal flashings. 9. Hollow metal doors and frames, wood door and hardware. 10. Overhead coiling door and integral service counter. 11. Fiberglass Windows 12. Solar Tubes 13. Gypsum board finishes. 14. Exterior and Interior Painting and Coatings 15. Toilet and Bath Accessories 16. Plumbing and fixtures. 17. HVAC Heating and Exhaust Equipment 18. Electrical, Lighting and Fire Alarm System Completion- 180 Calendar Days

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents