Similar Projects
RFP Design - City County Building Engineering Design Services for Air Handling Unit #7 Upgrades
Renovation
Bidding
$500,000 CJ est. value
Madison, WI 53703

Air Handling Unit Replacement 5 Buildings 7 and 8 6 Central Wisconsin Center - STC
Renovation
Sub-Bidding
$2,055,000 CJ est. value
Madison, WI 53704

Heat Pump Replacements
Alteration
Post-Bid
$623,000 est. value
Sun Prairie, WI 53590

HVAC System Replacement
Renovation
Post-Bid
$2,214,687 CJ est. value
Madison, WI 53715

SEG-HSU Water Heater Replacement
Renovation
Results
$198,243 CJ est. value
Madison, WI 53715

2021 HVAC Improvements Project
Renovation
Results
$1,994,000 CJ est. value
Madison, WI 53713

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Fitchburg Community Center Boiler Replacements
Renovation
Post-Bid
$500,000 CJ est. value
Fitchburg, WI 53711

Middleton City Hall HVAC Control Replacement
Renovation
Results
$86,520 CJ est. value
Middleton, WI 53562

HVAC System Renovation Chancellors Hall - UW Eau Claire
Renovation
Post-Bid
$1,136,500 CJ est. value
Madison, WI 53715

Boiler Replacement - MEP
Renovation
Results
$233,621 CJ est. value
Madison, WI 53715

Lakeside Boiler Replacement Cottage A - Mendota Mental Health Institute
Renovation
Results
$257,405 CJ est. value
Madison, WI 53704

A Tower Ventilation Renovation Witte Residence Hall MEP
Renovation
Results
$1,958,124 CJ est. value
Madison, WI 53706

Boiler 6 Installation - MEP
Renovation
Results
$1,580,000 CJ est. value
Madison, WI 53704

Mendota Mental Health Institute Boiler 6 Installation - AAC
Renovation
Results
$195,900 CJ est. value
Madison, WI 53704

Last Updated 01/05/2024 11:31 PM
Project Title

Boiler #6 Superheater Replacement - STC (Single Trade Contractor - MECHANICAL)

Physical Address View project details and contacts
City, State (County) Madison, WI 53706   (Dane County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

STC (Single Trade Contractor - MECHANICAL) The contractor shall provide all labor and materials necessary to install new superheater within existing Boiler No. 6. Included is demolition of some existing equipment and piping and the installation, set- up, testing and demonstration of the operation of the existing boiler. This project is a direct replacement of the superheater assembly in Boiler #6 - Cleaver Brooks CP-4188. The Contractor shall remove section existing boiler casing to provide access to existing superheater for removal. The Contractor shall remove existing side wall insulation in area required to adequately remove existing superheater assembly. Disconnect and remove existing expansion bellows at side wall (total of (4)). Disconnect and remove elbow and pipe sections thru side wall of boiler to superheater (total of (4)). The Contractor shall remove existing side wall and division wall, see plans for area of work. Disconnect both wall sections from upper and lower steam drums. The Contractor shall remove and replace the existing superheater associated with Boiler #6. Connect loose shipped piped elbows to new superheater assembly. Once new superheater has been installed within existing Boiler No. 6, Contractor shall reassemble the existing boiler to functional condition: o Install bellows expansion joints o Install division wall and side wall o Install insulation o Install exterior casing Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. In general the work consists of removal and replacement of the existing Charter Street Heating Plant 1(CSHP) Boiler #6 superheater assembly in its entirety and brings the boiler to a fully functional condition, 2 meeting the original design conditions. Base Bids will be received as follows: A single lump sum bid for All Work. MBE (9%), WBE (9%) Question Deadline 01/15/2024 Bidders shall bring inadequacies, omissions or conflicts to the Architect/Engineer's attention at least ten (10) days before the date set for bid opening.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents