Similar Projects
Mississippi River Water Re-Introduction into Bayou Lafourche
Infrastructure
Bidding
Thibodaux, LA

Phase 2 Installation of New Owner Furnished AMR Water Meters
Infrastructure
Bidding
Lake Charles, LA

2020 PUA CWEF Grant Improvements Altitude Valve at Elevated Storage Tank
Infrastructure
Post-Bid
Less than $65,000 est. value
Donaldsonville, LA

Saint Bernard Drinking Water Revolving Loan Fund Waterline Replacement
Infrastructure
Post-Bid
Chalmette, LA

Hoyle Creek Partial Force Main Replacement
Results
Lincolnton, NC 28092

John Hopkins Sewer Force Main Replacement
Infrastructure
Results
$707,900 est. value
Kenner, LA

Water Treatment Services-LDH
Infrastructure
Bidding
Iota, LA 70543

Collection and Distribution Pipe and Fittings
Infrastructure
Post-Bid
Lake Charles, LA

On-Call Water Valve Operation Services
Infrastructure
Results
New Orleans, LA

Magnolia Chase Force Main & Lift Station Improvements
Renovation, Infrastructure
Bidding
Benton, LA

WW Collection System Rehabilitation Cured in Place Pipe
Infrastructure
Post-Bid
Lafayette, LA

43 Watermain Replacement
Infrastructure
Results
Less than $12,895,874 est. value
New Orleans, LA

US 190 Pump Station Force Main Upgrade
Infrastructure
Bidding
Covington, LA

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

Bayou Saint John, Fairgrounds, Seventh Ward Group E (FRC)
Infrastructure
Results
New Orleans, LA

Reported 03/15/2022 12:00 AM
Project Title

Replace Copper Water Lines With Pex

Physical Address View project details and contacts
City, State (County) Natchitoches, LA   (Natchitoches County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all material, equipment, parts and labor required to perform all of the work of this contract. All line replacement shall occupy the same holes and placement as existing lines. New brass ball valves shall be installed at all buildings. All new lines shall connect directly to fixtures, appliances and filters. Manifold systems with separate shut off valves for each line shall be installed in locations having more than one fixture and/or appliance. All new lines shall be connected by crimp clamps with drop ear connectors where appropriate.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents