Similar Projects
Delaware No. 1 Water Pollution Control Facility Secondary Treatment Sludge Piping Upgrades
Bidding
Camden, NJ 08104

Well No 25 Water Treatment Plant
Bidding
Monroe Township, NJ 08831

Madison-Chatham Joint Meeting Facility Improvements
Post-Bid
Chatham, NJ 07928

Construction of a New Water Treatment Plant
Post-Bid
Freehold, NJ 07728

Replacement of Reverse Osmosis (RO) Membrane Elements
Results
Keansburg, NJ

WWTP Tertiary Filter Replacement
Results
$397,000 est. value
Flanders, NJ 07836

Storm Control Treatment Facility Construction Project
New Construction
Construction
Bridgewater, NJ 08807

Water Treatment Plant Upgrade, Chemical Building Expansion - Phase 2
Construction
Florence, NJ 08518

Tyson Foods Wastewater Treatment Plant
New Construction
Pending Verification
Vineland, NJ 08360

Decommission Wastewater Treatment Plant
Bidding
$591,650 est. value
Monroe Township, NJ 08831

Lead Service Line Replacement Program Phase II(A)
Post-Bid
Newark, NJ

Water Treatment Plant at Mathistown Road
Results
Little Egg Harbor, NJ 08087

Carl J. Olsen Treatment Plant - Upgrades and New Ozone Treatment Facility
New Construction, Renovation
Construction
Edison, NJ 08817

Wastewater Treatment Plant Thickener Facilities Upgrades
Renovation
Bidding
Union, NJ

Freehold Borough Water Treatment Plant
Post-Bid
Freehold, NJ

Last Updated 02/20/2020 08:13 AM
Project Title

Wastewater Treatment Plant Unit Substation Maintenance and Testing

Physical Address View project details and contacts
City, State (County) Lincoln Park, NJ   (Morris County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of preventative maintenance and testing work for Unit Substations 1, 2 and 3 as specified in the contract documents including but not limited to infrared testing of the transformer connections, cleaning of switch interiors, and replacing and testing plant ground resistance at each substation. This will include cleaning and repairs to the seven (7) MV switches at USS 1 and the five (5) each at USS 2 and 3. Additionally, the grounding systems at MCCs associated with these USSs will be upgraded. The contract also includes On-Call Services for Testing and Repairs for the length of the contract. The work is located within the TBSA Wastewater Treatment Plant, Lincoln Boulevard, Lincoln Park, New Jersey.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents