Similar Projects
Last Updated | 02/20/2020 08:13 AM |
Project Title | Wastewater Treatment Plant Unit Substation Maintenance and Testing |
Physical Address | View project details and contacts |
City, State (County) | Lincoln Park, NJ (Morris County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work consists of preventative maintenance and testing work for Unit Substations 1, 2 and 3 as specified in the contract documents including but not limited to infrared testing of the transformer connections, cleaning of switch interiors, and replacing and testing plant ground resistance at each substation. This will include cleaning and repairs to the seven (7) MV switches at USS 1 and the five (5) each at USS 2 and 3. Additionally, the grounding systems at MCCs associated with these USSs will be upgraded. The contract also includes On-Call Services for Testing and Repairs for the length of the contract. The work is located within the TBSA Wastewater Treatment Plant, Lincoln Boulevard, Lincoln Park, New Jersey. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |