Similar Projects
Saylor-Beall Air Pump Model 9000 with Installation
Infrastructure
Bidding
Springfield, MO

Wetwell and Overflow Pipe Repairs
Infrastructure
Bidding
Less than $296,000 est. value
Saint Joseph, MO

Electrical Submersible Dewatering Pumps
Post-Bid
Saint Louis, MO

Highway Department Maintenance Facility - Phase 2
Post-Bid
Carthage, MO

Rehabilitate Relief Wells Phase 3
Infrastructure
Results
Kansas City, MO

Missouri Bluffs Park Well
Alteration
Results
Lake Saint Louis, MO 63367

1/2 Hp Cast Iron Pump
Term Contract
Post-Bid
Saint Louis, MO

Lime Slurry Pumps
Infrastructure
Results
Festus, MO

Well Maintenance Contract Services
Term Contract, Infrastructure
Post-Bid
O Fallon, MO

Plugging of Well 10, Well 11, and Voss Well
Infrastructure
Results
Sullivan, MO

Neptune-Abaque Peristaltic Industrial Hose Pump Unit Model HDN25
Infrastructure
Post-Bid
Springfield, MO

JCHMF Phase 2 – Water Supply Well
Infrastructure
Results
Carthage, MO

Fire Pump Replacement and Alarm Device Upgrade
Infrastructure
Post-Bid
Saint Joseph, MO

Submersible Pump and Motor for the WWTP East Well
Infrastructure
Results
Lebanon, MO

Design-Build Platform for Pump Disconnects
Infrastructure
Results
Saint Peters, MO

Reported 08/25/2021 12:00 AM
Project Title

Replacing Ras Pumps, Control Panels, Check Valves, Piping and Motors

Physical Address View project details and contacts
City, State (County) Fulton, MO   (Callaway County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents