Similar Projects
Last Updated | 10/06/2022 12:38 PM |
Project Title | RFQ Engineering - General Engineering Services (GEC) for Interstate 10 and Country Club Road TI; and Interstate 10 and Kino Parkway TI |
Physical Address | View project details and contacts |
City, State (County) | Comobabi, AZ 85634 (Pima County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All format requirements, submittal guidelines, instructions and documentation submission contained in this RFQ Package are for the ADOT Contract Number and ADOT Project Number referenced above. SOQ submittals failing to follow the format, online submittal guidelines or any other instructions outlined in this RFQ Package shall be rejected. As format instructions and guidelines for each advertisement/RFQ Package vary, read this RFQ Package carefully. The ECS Consultant Contract Manual (ECS Manual) governs the ECS Qualification Based Selections (QBS) process and this ECS solicitation, selection and negotiation process; however the requirements and instructions in this RFQ supersede the ECS Manual. The ECS Manual governs in all matters silent in this RFQ. ADOT reserves the right to reject any and all SOQs, or cancel the advertisement, negotiations or contract at any time in the best interest of the State. Any firm that has submitted an SOQ as a prime Consultant and is identified as a Subconsultant in another prime Consultant's proposal shall have their prime Consultant SOQ submission rejected. If a prime Consultant lists firms as Subconsultants in its SOQ, the prime Consultant must be able to provide ADOT with evidence, if requested, of written consent provided by the Subconsultant firms that are listed as part of their prime Consultant's SOQ, or that prime Consultant's SOQ will be rejected. A firm who proposed, but was not selected may be added as a Subconsultant after the contract has been executed. This contract has been established as Race Neutral with a 0.00% DBE Goal. The Compensation Type for this contract will be Cost Plus Fixed Fee. The non-negotiable Fixed Fee for this contract, and any applicable extensions, has been established at 10%. Questions Due: October 14, 2022 at 2:00 P.M. Arizona (Phoenix) Time SOQ Submittal Due Date: October 25, 2022 at 2:00 P.M. Arizona (Phoenix) Time Estimated Selection Date: December 2, 2022 Initial Cost Proposal Due Date: December 16, 2022 Estimated Contract Notice to Proceed Date: March 6, 2023 The method of contractor selection has not been determined at this time. AZDOT - RFQ Engineering - General Engineering Services (GEC) for Interstate 10 and Country Club Road TI; and Interstate 10 and Kino Parkway TI |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |