Similar Projects
SR 4012 over Robinson Run-1-DFB
Renovation, Infrastructure
Conception
$200,000 est. value
Washington, PA

SR 4012 over Robinson Run-1-DFB
Renovation, Infrastructure
Conception
$200,000 est. value
Washington, PA

SR 4057 over Brush Run
Infrastructure
Design
$3,175,000 CJ est. value
Blaine Township, PA 15312

SR 4057 over Brush Run
Infrastructure
Design
$3,175,000 CJ est. value
Blaine Township, PA 15312

Chartiers Bridge #58
Demolition, New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Washington, PA 15301

Chartiers Bridge #58
Demolition, New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Washington, PA 15301

Ridgewood Bridge Repair Project
Infrastructure
Post-Bid
Cecil, PA

Canonsburg and Mount Pleasant Street Improvements
Infrastructure
Post-Bid
Washington, PA

SIP 12-20-SI4-1
Results
$2,500,000 to $4,999,999 est. value
PA

2020 Pavement Rehabilitation Project
Results
Canonsburg, PA

Abandoned Mine Reclamation (AMR) Monongahela South No. 1 - Phase 2
Infrastructure
Construction
$493,352 CJ est. value
Monongahela, PA 15063

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

Pigeon Creek Pump Station Outfall and West Alley Repairs Project
Infrastructure
Design
$60,000 CJ est. value
Monongahela, PA 15063

Valleybrook/Bebout Rd Intersection
Infrastructure
Bidding
$2,500,000 CJ est. value
McMurray, PA 15367

Major Bridge P3
New Construction
Post-Bid

Last Updated 10/04/2022 07:03 AM
Project Title

Speers Bridge Improvements

Physical Address View project details and contacts
City, State (County) Speers, PA 15022   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $349,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Goals for Minority Participation for Each Trade 6.3% Goals for Female Participation in Each Trade 6.9% Each bid shall be accompanied by a bid guaranty, which shall not be less than ten percent (10%) of the total amount of the bid. The form of the guaranty shall be in accordance with the type permitted under the contract documents. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project; that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, age, color, religion, sex, national origin, or handicap. The Redevelopment Authority of the County of Washington reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by the Redevelopment Authority of the County of Washington for a period not to exceed forty-five (45) days from the date of opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the contract. In no event will the Redevelopment Authority of the County of Washington consider a contractor as eligible if he cannot initiate the work under the contract within 15 days of the contract execution and proceed to the successful completion of the work within 60 consecutive calendar days of the Notice to Proceed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents