Similar Projects
Halls River Resort
New Construction - 135,223 SF
Conception
Homosassa, FL 34448

Miami Freedom Park & Soccer Village
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

Atlantic 3350
New Construction - 647,925 SF
Design
$85,000,000 est. value
Pompano Beach, FL 33062

Hyatt Place
New Construction - 133,000 SF
Post-Bid
$32,800,000 est. value
Gainesville, FL

Tribute by Marriott
New Construction
Post-Bid
$12,000,000 est. value
Saint Augustine, FL 32080

Renaissance Hotel
New Construction, Demolition - 72,000 SF
Construction
$14,000,000 est. value
Saint Augustine, FL 32084

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

San Sebastian Inland Harbor
New Construction - 50,118 SF
Conception
$80,000,000 est. value
Saint Augustine, FL

72 & Collins
New Construction - 232,338 SF
Design
$17,495,787 est. value
Miami Beach, FL 33010

Holiday Inn Express
New Construction - 61,658 SF
Post-Bid
$5,000,000 est. value
Tampa, FL 33607

City Center West Orange Master Plan
New Construction
Construction
$150,000,000 est. value
Ocoee, FL 34761

Baby Grande
New Construction, Build-Out - 25,001 SF
Conception
Destin, FL

Solis Orlando Resort, Capella Suites Hotel and Retail Complex
New Construction - 1,600,000 SF
Design
$500,000,000 est. value
Orlando, FL 32819

Daytona Beach Convention Hotel & Condos
New Construction - 1,100,000 SF
Construction
$203,000,000 est. value
Daytona Beach, FL 32118

Last Updated 06/12/2020 04:02 PM
Project Title

Fairfield Inn by Marriott

Physical Address View project details and contacts
City, State (County) Melbourne, FL 32940   (Brevard County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method
Project Status Permitting
Bids Due View project details and contacts
Estimated Value $9,353,830
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Hotel/Motel, 4 Stories Above Grade, New Construction 91 Unit(s).
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Hospitality Equipment, Registration Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents