Similar Projects
Campus Infrastructure Support Construction - Prairie View A&M University
Infrastructure
Conception
$8,000,000 CJ est. value
Prairie View, TX 77446

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Twinwood Business Park Building 4
New Construction, Infrastructure - 181,241 SF
Design
$8,875,511 CJ est. value
Brookshire, TX 77423

Sunterra Section 48 Water, Sanitary, and Drainage Facilities
Infrastructure
Bidding
$1,386,593 CJ est. value
Hempstead, TX 77445

Water Supply and Storage Facility Phase 1 to serve La Segarra
Infrastructure
Bidding
$820,000 CJ est. value
Brookshire, TX 77423

Texas Heritage Parkway Section 3C
Infrastructure
Post-Bid
$3,900,000 CJ est. value
Hempstead, TX 77445

Starbucks / Prairie View - Site Work Bid
New Construction, Infrastructure - 2,016 SF
Post-Bid
$100,000 CJ est. value
Prairie View, TX 77445

Mass Grading and Detention Improvements for Lakeview
Infrastructure
Results
TX

US0290 - Bridge Deck Repair
Infrastructure
Results
$233,500 CJ est. value
Prairie View, TX 77445

O'Reilly Auto Parts (BKS) #6256 / Brookshire
New Construction, Infrastructure - 7,650 SF
Construction
$1,300,000 CJ est. value
Brookshire, TX 77423

Construction of Water, Sanitary, and Drainage Facilities in Sunterra Section 31
Infrastructure
Pending Verification
$890,508 CJ est. value
Hempstead, TX 77445

Tamarron West Rec Center
New Construction, Infrastructure - 11,865 SF
Pending Verification
$2,500,000 CJ est. value
Brookshire, TX 77423

Twinwood Business Park Building 2
New Construction, Infrastructure - 91,288 SF
Design
$4,880,679 CJ est. value
Brookshire, TX 77423

Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to Serve Attwater, Section One
Infrastructure
Bidding
$1,500,000 CJ est. value
Hempstead, TX 77445

Villa Capri Subdivision Wastewater Pump Station and Waterline Replacement
Renovation, Infrastructure
Post-Bid
$160,000 CJ est. value
Prairie View, TX 77446

Last Updated 06/23/2023 06:07 PM
Project Title

Construction of Ground Storage Tank at Water Plant No. 5

Physical Address View project details and contacts
City, State (County) Hempstead, TX 77445   (Waller County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $484,100 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 23, 2022 the project was awarded to TTE, LLC, the awarded amount is $484,100.00 Construction of a bolted steel ground storage tank with a capacity of approximately 450,000 gallons. The major items of work include the Tank, foundation, and the appurtenances that are attached to the tank. No fencing, yard piping, and only minimal electrical and access work are included in the contract. - Connect ground storage tank to yard piping (2 places), completion- 270 calendar days Job No.: WaterPlant No 5 Question Deadline 05/18/2023 Information / Clarification shall be submitted in writing by Email.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents