Similar Projects
2022 Street and Utility Project
Infrastructure
Bidding
WI

Twin Valley Road Improvements
Infrastructure
Bidding

2021 Roadway Improvements
Post-Bid
Less than $275,000 est. value
Cedarburg, WI

2022 Roadway Improvements - Chip Seal
Infrastructure
Post-Bid
Cedarburg, WI 53012

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 GSB-88 Bituminous Seal
Infrastructure
Post-Bid
Mequon, WI

2021 Street Improvement Program
Results
Grafton, WI 53024

2022 Crack Sealing
Infrastructure
Post-Bid
Mequon, WI

2021 Roadway Improvements - Chip Seal
Results
$60,000 est. value
Cedarburg, WI

Colonial Drive Reconstruction
Results
$200,000 est. value
Saukville, WI 53080

Cedarburg Business Park - Phase 3 Roadway Plans
Results
Cedarburg, WI

2021 Street and Utility
Results
$943,155 est. value
Cedarburg, WI

2021 Crack Sealing
Results
Mequon, WI

2021 GSB-88 Bituminous Seal
Results
Mequon, WI

Reported 03/02/2022 12:00 AM
Project Title

2022 Road Improvements

Physical Address View project details and contacts
City, State (County) Mequon, WI   (Ozaukee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 02/15/22
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes 3.86 miles of pavement milling and removal, 0.77 miles of pavement pulverize and relay, base repair and compacting; asphalt of binder and surface layers, curb & gutter, and catch basin repairs. Additive bid items include 1.0 miles of pavement milling and removal, 1.58 miles of pavement pulverize and relay, base repair and compacting, asphalt paving both lower and upper layers and shouldering. Location : Granville Road Mequon Business Park Cheverny Drive Miller Court Highland Ridge Subdivision Birch Creek Road Vintage Estates Subdivision

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents