Similar Projects
Moscow North and Moscow Alt Route
Infrastructure
Results

Adding Two through Lanes On Us-93, Mp 57.23 To 59.49; 100 South Rd.
Infrastructure
Results
ID

Readiness Center (Re-Bid)
LEED Certification, New Construction, Infrastructure - 48,500 SF
Results
$22,350,000 CJ est. value
Jerome, ID 83338

Readiness Center (Re-Bid)
LEED Certification, New Construction, Infrastructure - 48,500 SF
Results
$22,350,000 CJ est. value
Jerome, ID 83338

FY23, SH-34 D5 Guardrail Replacement
Infrastructure
Results
$1,100,000 CJ est. value
Preston, ID 83263

FY23, SH-34 D5 Guardrail Replacement
Infrastructure
Results
$1,100,000 CJ est. value
Preston, ID 83263

Jerome County Readiness Center - Re-Bid
LEED Certification, New Construction, Infrastructure - 48,500 SF
Post-Bid
$18,400,000 CJ est. value
Jerome, ID 83338

Tommy's Car wash
New Construction, Infrastructure - 5,034 SF
Post-Bid
$1,000,000 CJ est. value
Jerome, ID 83338

I-84, Jerome IC to Twin Falls IC
Infrastructure
Results
$92,971,850 CJ est. value
Jerome, ID 83338

I-84, Jerome IC to Twin Falls IC
Infrastructure
Results
$92,971,850 CJ est. value
Jerome, ID 83338

300 West, 100 North to 200 North Cement Recycled Asphalt Base Stablization (CRABS)
Infrastructure
Post-Bid
$900,000 CJ est. value
Jerome, ID 83338

300 West, 100 North to 200 North Cement Recycled Asphalt Base Stablization (CRABS)
Infrastructure
Post-Bid
$900,000 CJ est. value
Jerome, ID 83338

Jefferson Elementary School Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Jerome, ID 83338

Manufactured Housing
New Construction, Infrastructure
Results
$438,000 CJ est. value
Jerome, ID 83338

Manufactured Housing
New Construction, Infrastructure
Results
$438,000 CJ est. value
Jerome, ID 83338

Last Updated 05/03/2023 08:37 AM
Project Title

US-93 Interchange Ramps

Physical Address View project details and contacts
City, State (County) Sugar Loaf, ID 83338   (Jerome County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Signal upgrades, addition of a turn lane, mill and overlay, and CRABS on the On and off ramps at interchange 173, signal upgrades and addition of a turn lane on I-84 Please contact the Resident Engineer ***SHIHAB AL BEIRUTI P.E.*** AT (208) 886-7851 or Shihab.AlBeiruti@itd.idaho.gov for any design related questions. Est. Value Notes: $5,000,000.00 to $10,000,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents