Similar Projects
Coddle Creek Tributary Outfall Near Concord Parkway South - City of Concord
Infrastructure
Conception
$4,746,000 est. value
Concord, NC 28025

Airport Helipads - City of Concord
New Construction, Infrastructure
Conception
$410,000 est. value
Concord, NC 28027

Red Bull Manufacturing and Distribution Center
New Construction, Infrastructure - 1,400,000 SF
Design
$740,000,000 CJ est. value
Concord, NC 28027

Project Back to the USA
New Construction, Infrastructure - 46,500 SF
Design
$3,500,000 CJ est. value
Concord, NC 28027

2023 Street Maintenance Proiect: Gelding Drive & Pelham Lane Fall-Depth Reclamation (FDR) & Paving & Emergency Crossover of NC 24-27
Infrastructure
Bidding
$250,000 CJ est. value
Midland, NC 28107

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Public Safety Training Facility in Cabarrus County, North Carolina
New Construction, Infrastructure
Post-Bid
$17,000,000 CJ est. value
Concord, NC 28025

Sequoia Hills Drive Water Main Expansion
Infrastructure
Results
$400,000 to $450,000 est. value
Harrisburg, NC 28075

Parking Lots and Roadway Improvements
Infrastructure
Results
$1,138,757 CJ est. value
Mount Pleasant, NC 28124

Davidson Highway Industrial
New Construction, Infrastructure - 139,800 SF
Construction
$75,000,000 CJ est. value
Concord, NC 28027

R. Brown McAllister Elementary School - Early Release Packages
New Construction, Infrastructure - 116,000 SF
Construction
$37,000,000 CJ est. value
Concord, NC 28025

Lakeshore Corporate Park
New Construction, Infrastructure - 660,000 SF
Pending Verification
$49,000,000 CJ est. value
Kannapolis, NC 28082

Bakers Creek Park
New Construction, Infrastructure
Pending Verification
$141,000,000 CJ est. value
Kannapolis, NC 28081

Miami Church Road 12"/24" Parallel Water Line Extension - US Highway 601 To Cold Springs Road - City Of Concord
Infrastructure
Conception
$7,718,000 est. value
Concord, NC 28025

JE Jim Ramseur Park - City of Concord
New Construction, Infrastructure
Design
$19,300,000 CJ est. value
Concord, NC 28027

Last Updated 02/20/2024 01:01 PM
Project Title

Lower Coddle Creek Parallel Interceptor Project

Physical Address View project details and contacts
City, State (County) Concord, NC 28025   (Cabarrus County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed sanitary sewer interceptor will be constructed in two phases; the first phase (base bid) extends from Rocky River Road up to Wolf Meadow Creek and the second phase (bid alternate) extends from Wolf Meadow Creek to approximately Coddle Creek Drive SW. In total the two phases will consist of approximately 39 LF of 60" fiberglass pipe, 39 LF of 54" fiberglass pipe, 20,013 LF of 48" fiberglass and ductile iron pipe, 7,943 LF of 36" fiberglass and ductile iron pipe, 1,395 LF of 30" fiberglass and ductile iron pipe, three cast-in-place concrete diversion structures, 11 manholes with 5' diameter base and 5' diameter riser structure, 30 manholes with 6' diameter base and 5' diameter riser structure, 73 manholes with 7' diameter base and 5' diameter riser structure, one manhole with 8' diameter base and 5' diameter riser structure, three manholes with 10' diameter base and 5' diameter riser structure, one trenchless crossing at Roberta Road (SR-1304), and 21 sanitary sewer stream crossings. The project also includes miscellaneous rehabilitation of the existing sanitary sewer system including 1,898 LF of CIPP and miscellaneous manhole rehabilitation. For information regarding this project please contact: Morgan Hampy Gavel & Dorn Engineering 6730 Freedom Drive, Charlotte, NC 28214 Phone: 704-919-1900 x216 Email: mhampy@gaveldorn.com Bidders must be licensed contractors in the State of North Carolina. All Subcontractors must also be licensed contractors in the State of North Carolina. Bids will be received on a unit price basis. Bid security in an amount of 5 percent of the Bidder's maximum Bid must accompany each Bid. The Successful Bidder will be required to furnish a Construction Performance Bond and a Construction Payment Bond as security for the faithful performance and the payment of all bills and obligations arising from the performance of the Contract. Contractor and all Subcontractors will be required to conform to the labor standards employment requirements set forth in the Contract Documents. The Bidder is required to make a good faith effort to meet a 10 percent goal for minority business participation in the total value of Work in accordance with State G.S. 143-128.2. The Bidder shall identify efforts made in this regard and list minority business enterprises that will be used on the project as required in the Bidding Documents. If the Contract is to be awarded, Owner will give the Successful Bidder a Notice of Award within the number of days set forth in the Bid Form for acceptance of the Bid. Project Description a) Phase 1 (Base Bid) i) Sewer rehabilitation (CIPP, new manholes, manhole lining) ii) Approximately 20,619 LF of new 48" pipeline, paralleling existing sewer, with three (3) diversion structures iii) Connections to existing North Carolina Railroad (NCRR) and NCDOT sewer crossings. Existing crossings consist of manholes each side of right-of-way with tunnel liner plates of varying diameter and 48" carrier pipe. (1) Carrier pipe is full of water, so will be necessary to pump them out iv) All permanent and temporary easements have been acquired b) Phase 2 (Bid Alternate) i) Approximately 7,812 LF of new 36" pipeline, paralleling existing sewer, with one (1) diversion structure ii) One trenchless crossing at Roberta Road iii) Limited easements acquired Estimated Notice to Proceed: April 2024 Construction Duration: 730 calendar days i) Substantial Completion: 700 calendar days ii) Liquidated Damages: $2,000 per day

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents