Last Updated 01/11/2022 11:28 AM
Project Title

2022 Sanitary Sewer Lining

Physical Address View project details and contacts
City, State (County) Omro, WI   (Winnebago County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction of pipelines and conduits by the installation of a resin impregnated flexible tube via a process commonly referred to as Cured-In-Place-Pipe (CIPP). This tube shall be inverted into the original pipeline/conduit and expanded to fit tightly against said pipeline by the use of water or air pressure. The resin system shall then be cured by elevating the temperature of the water or air used for the inflation to a level sufficient for the initiators in the resin to effect a thermosetting reaction.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents