Similar Projects
Windermere Ward Trail - Town of Windermere
Infrastructure
Conception
Less than $2,590,000 est. value
Windermere, FL

Reams Road Widening Project - Orange County
Infrastructure, Alteration
Conception
$39,300,000 est. value
FL

Orange Technical College Winter Park Campus Replacement Project
New Construction, Renovation, Infrastructure
Design
$40,000,000 CJ est. value
Winter Park, FL 32789

Construction Management at Risk Services For Winter Park High School Comprehensive Project
Renovation, Addition
Design
$9,900,000 est. value
Winter Park, FL 32792

Ficquette Road - Orange County
Infrastructure
Post-Bid
$1,600,000 CJ est. value
Windermere, FL 34786

H Mart / Orlando
Build-out, Infrastructure - 184,876 SF
Post-Bid
$7,000,000 CJ est. value
Orlando, FL 32818

Texas Avenue From Duskin Avenue to South of Holden Avenue
Infrastructure
Results
$41,885,062 CJ est. value
Orlando, FL 32839

Construction Management at Risk Services for Dommerich Elementary School and Maitland Middle School Multi-System Capital Renewal Project
Renovation
Results
$6,619,000 est. value
Maitland, FL 32751

Floridian Town Center
New Construction, Infrastructure - 290,000 SF
Construction
$500,000,000 CJ est. value
Apopka, FL 32712

Site 65-M-W-4 New Multi Story Middle School Project
New Construction - 185,000 SF
Construction
Less than $36,000,000 est. value
Orlando, FL 32809

Gem Groves
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Winter Garden, FL 34787

Environmental Products Group New Warehouse
New Construction, Infrastructure - 41,952 SF
Pending Verification
$5,000,000 CJ est. value
Apopka, FL 32703

Restoration Project - City of Orlando
Infrastructure
Conception
$5,000,000 est. value
Orlando, FL 32885

Lake Copeland Apartments
New Construction, Infrastructure - 13,200 SF
Design
$13,000,000 CJ est. value
Orlando, FL 32806

Christian Brothers Automotive / Ocoee - Rebid
New Construction, Infrastructure - 4,561 SF
Post-Bid
$1,200,000 CJ est. value
Ocoee, FL 34761

Last Updated 10/10/2023 03:02 AM
Project Title

RFQ Construction Management at Risk Services - The Chain of Lakes Middle School Comprehensive Renovation

Physical Address View project details and contacts
City, State (County) Orlando, FL 32835   (Orange County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Request for Proposals (RFPs), Request for Qualifications, Construction start expected September 2025
Bids Due View project details and contacts
Estimated Value $38,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Management at Risk Services for the Chain of Lakes Middle School Comprehensive Renovation Project The estimated construction cost is $38,000,000. Major elements of the project include: A comprehensive renovation project for Chain of Lakes MS at 8700 Conroy-Windermere Rd. Orlando, FL., 32835. Comprehensive renovation and remodeling of the entire campus to provide improved facilities meeting Orange County Public Schools' Design Guidelines and educational program requirements. The project scope includes all renovations needed to address current deficiencies and to upgrade all building and site facilities, systems, and finishes at or near the end of their useful life. The scope also provides for the remodeling of existing spaces to support current programs, life safety, and accessibility requirements. Construction will occur on an occupied campus. The scope will also include any temporary facilities and classrooms required to support construction phasing. The comprehensive renovation will be designed for a student capacity of 1215. A new addition of approximately 12,000 square feet may be required to accommodate the projected student capacity. Question End Date 9/21/2023 2:30 PM he OCPS MWBE participation goal for this project is 23%. The OCPS LDB participation goal for this project is 10%. The OCPS VBE goal is 3%. In addition to the information provided for this requirement, additional data related to goal achievement on OCPS and non-OCPS projects may be provided to the Proposal Evaluation Committee for evaluation purposes

Details

12,000 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents