Similar Projects
Sheriffs Office & Jail Project
New Construction
Conception
Bend, OR 97701

Benton County Picks North Corvallis Site For New Jail & Justice Center
New Construction
Conception
$50,000,000 est. value
Corvallis, OR

Contact Center System Replacement
Alteration
Design
$50,000 est. value
Salem, OR

Central Distribution Center (CDC) HVAC Upgrades
Renovation
Sub-Bidding
$350,000 CJ est. value
Salem, OR 97301

Santiam Correctional Institution (SCI) Boiler Replacement
Renovation
Sub-Bidding
$950,000 CJ est. value
Salem, OR 97317

Classroom Visual Solutions
Term Contract
Post-Bid
$2,000,000 est. value
Salem, OR

Video Surveillance System Installation
Alteration
Post-Bid
Portland, OR 97232

BESC Parking Security
Alteration
Results
Portland, OR 97227

Indefinite Delivery or Indefinite Quantity Classroom Backbone Infrastructure Modernization
Alteration
Results
Portland, OR

Sheriffs Office & Jail Projects
Renovation
Conception
Bend, OR 97701

Comprehensive City-Wide VoIP Phone System
Term Contract
Sub-Bidding
Bandon, OR 97411

CB2 at Brewery Blocks 2 Building
Alteration
Post-Bid
Portland, OR

Wastewater System Scada/Plc On-Call/Support Services
Alteration
Results
Redmond, OR

OSCI Roof Repairs
Renovation
Sub-Bidding
$2,500,000 CJ est. value
Salem, OR 97310

DG10--Network Cabling - One Time Service
Term Contract
Post-Bid
Portland, OR 97239

Last Updated 08/11/2022 05:06 PM
Project Title

Juvenile Fire Alarm Replacement

Physical Address View project details and contacts
City, State (County) Eugene, OR 97401   (Lane County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Prison/Jail, Security/Communications
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Lane County will receive Bids for a Combined Contract, which includes, but is not limited to, the Addressable Fire Alarm System Replacement, and related work for the Lane County Juvenile facility, in Eugene, Oregon. Bids must be on a Lump Sum basis. Bidders shall provide an owners contingency of $10,000.00 for use of any changes from State Fire Marshals (SFM) review of the construction documents. If there are no required changes by the SFM the entire amount or the unused portion shall be refunded to the owner. Bid Security in the amount of five percent (5%) of the Bid must accompany each Bid in accord with the Instructions to Bidders. All Bidders are subject to and must comply with applicable state and federal antidiscrimination laws. All Bidders are required to obtain all necessary licenses and permits required to perform this work. Performance bond and labor and material payment bond covering the faithful performance of the Contract and the payment of all obligations arising thereunder, each in the amount of one hundred percent (100%) of the Contract Sum, shall be submitted in duplicate to the Engineer, together with the executed Owner-Contractor Agreements, within ten (10) days after notification of award of the Contract. Such bonds shall be issued by a surety company acceptable to the Owner and properly licensed in the State of Oregon and shall be on AIA Document A312, latest edition. The Owner reserves the right to reject any or all Bids and to waive informalities or irregularities in the Bidding.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents