Similar Projects
Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Six Box Hangars - TR-AP-10-01 - City of Ann Arbor
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Ann Arbor, MI 48108

Concrete Shared-use Path, Curb, Gutter, Sidewalk and Ramps, Storm Drain and Pavement Markings on Woodward Avenue
Infrastructure
Design
$2,739,086 CJ est. value
Pleasant Ridge, MI 48069

Thurston Woods Splash Pad
New Construction, Infrastructure
Design
$200,000 CJ est. value
Sturgis, MI 49091

Take 5 Oil Change / Warren
New Construction, Infrastructure - 1,430 SF
Bidding
$420,000 CJ est. value
Warren, MI 48093

Southwest Elementary Playground Upgrades
Infrastructure
Bidding
$300,000 CJ est. value
Grand Rapids, MI 49503

Repair West Perimeter Fence
Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Battle Creek, MI 49015

Kalamazoo RESA Career and Technical Education (CTE) Center BP1 Civil and Sitework
Infrastructure - 160,000 SF
Sub-Bidding
$5,000,000 CJ est. value
Kalamazoo, MI 49001

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

Replacement Of Submersible Pumps At 4 Lift Stations -Alpena Combat Training Center
Renovation
Post-Bid
Alpena, MI

Pump Station J Replacement
Results
Muskegon, MI 49442

Conant Street, Detroit-Site Remediation
Results
Hamtramck, MI 48212

PNC Bank Branch No. B839
Renovation
Construction
Wyoming, MI 49509

Cornerstone Alliance - Industrial Park Stormwater Project
New Construction
Construction
Benton Harbor, MI 49022

The Downs at Northville Mixed-Use Development
New Construction, Renovation, Infrastructure - 19,000 SF
Pending Verification
$200,000,000 CJ est. value
Northville, MI 48167

Last Updated 08/11/2022 02:06 PM
Project Title

Roscommon Area Public Schools new High School water supply well & new Elementary School Irrigation well

Physical Address View project details and contacts
City, State (County) Roscommon, MI 48653   (Roscommon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

All bids submitted shall be from a prime bidder only and shall include all subcontractor costs for scopes identified in the contract documents. This project does not require prevailing wages The project scope of work includes (but not limited to) the following: 1. High School: Installing one (1) new water supply well, one (1) new submersible pump and motor, replacing electrical and controls system, new supply piping, new interior piping and accessories, extending the casing and reinstalling a pitless adapter on an existing well, proper abandonment of a failed well, and appurtenant work. 2: Elementary School Installing one (1) new irrigation supply well, one (1) new submersible pump and motor, electrical and controls system, and appurtenant work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents