Similar Projects
Purchase of Ductile, Cast Iron, and Steel Fittings
Term Contract
Post-Bid
Brockton, MA

Fire Hydrants
Term Contract
Post-Bid
Brockton, MA 02301

Low Flow Toilets
Results
Less than $48,000 est. value
Pembroke, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Materials and Supplies
Term Contract
Post-Bid
Marshfield, MA

Water Meters/Reading Equipment
Term Contract
Results
Hanover, MA

Water Main Replacement Phase 4B
Post-Bid
$1,850,000 est. value
Scituate, MA

Water Distribution Materials and Supplies
Term Contract
Results
Hanover, MA

Water Works Material
Infrastructure
Post-Bid
Abington, MA

Furnishing and Installing Three New 20-Inch Tapping Sleeves and Line Stops
Results
Brockton, MA 02301

Marshfield Pump Station Flow Meter Project
Alteration
Post-Bid
$60,000 est. value
Marshfield, MA

Replacing Two Hydrants Within The Water Distribution System
Results
Less than $15,000 est. value
Marion, MA

FY 21 Water Main Replacement Hingham and Hull
Infrastructure
Post-Bid
$1,550,000 est. value
Hingham, MA

Old Orchard Water Main - MBTA Crossing
Results
Less than $47,500 est. value
Kingston, MA 02364

Bulow Road Water Main Replacement
Results
Less than $540,000 est. value
Hingham, MA 02043

Last Updated 10/05/2021 05:44 PM
Project Title

2021 Water Main Improvements for Thomas Street, Thomas Circle and Morse Avenue

Physical Address View project details and contacts
City, State (County) Brockton, MA   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes, but is not limited to, new 8-inch water mains and appurtenances to replace existing water mains within Thomas Street, Thomas Circle, and Morse Avenue, including furnishing and installing new water service connections, fittings, valves, hydrants, connections to the existing water system, installing and removing temporary service pipe, removing, furnishing and installing new catch basin frames and grates, drain manholes frames and covers and sewer manhole frames and covers, all earthwork, dewatering and drainage, roadway reconstruction/reclamation for Thomas Street and Thomas Circle, mill and overlay of Morse Avenue, wheelchair ramps, restoration, utility crossing, traffic management, miscellaneous work and cleanup.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents