Similar Projects
Williams Avenue Utility Relocations at Centennial Parkway
Results
$350,000 to $380,000 est. value
Las Vegas, NV

Flamingo-Boulder Hwy North, Charleston-Maryland to Boulder Hwy and Maryland Pkwy System (Charleston-Maryland Storm Drain)
Results
$51,800,000 to $62,600,000 est. value
Las Vegas, NV 89121

Nellis Meadows Park Odor Control Feed Station
Results
$198,000 to $231,000 est. value
Las Vegas, NV 89121

Sewer Lateral Warranty and Marketing Services
Post-Bid
Las Vegas, NV 89121

Repair Grease Interceptors at Satellite Concourse D
Results
NV

McCarran International Airport Repair Grease Interceptors
Post-Bid
Las Vegas, NV 89121

Stead Sewer Capacity Project - Phase I
Results
Reno, NV

Y--Force Main Replacement
Post-Bid
Boulder City, NV

2021 Sewer Maintenance, Repairs, & On-Call Services,
Term Contract
Results
$700,000 to $800,000 est. value
Reno, NV

Last Updated 05/19/2021 08:56 AM
Project Title

Fire Station 18 Sanitary Sewer Line Replacement

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89119   (Clark County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $734,350 to $773,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The PROJECT of which the WORK of the contract is a part titled Fire Station #18: Sanitary Sewer Line Replacement and is located at 575 East Flamingo Road, Las Vegas, NV 89119. The WORK is described in the project drawings and divisions 1 through 48 of the project manual. The “Work” consists of the removal and replacement of all existing vertical stacks, lateral sanitary sewer lines from below grade at level one to level three and all existing grease waste and vent lines through the rooftop area in the existing 3-story building of approximately 38,000 square feet. Construction includes all administrative work as required by Division 01 general requirements; Selective Demolition of existing gypsum finishes such as wallboard, lath and plaster, ceramic floor/wall tile, selective demolition of VCT flooring, x-ray scanning and trenching of interior and exterior concrete surfaces and utilizing vacuum or hand digging excavation methods to expose existing installed subsurface utilities, removal of existing fixtures, toilet partitions and equipment as shown on architectural plans and as required to access and remove sanitary waste and vent plumbing lines; installation of new sanitary waste and vent sewer lines throughout the building including below slab sanitary sewer. Construction also includes restoration of all affected finishes including, but not limited to wall and ceiling finishes; reinstallation of plumbing and/or electrical fixtures and equipment; installation of restroom countertops as specified; installation of new access doors; and all patching/painting of work areas as shown on architectural plans and specified herein. Construction also includes the installation of temporary controls and separation barriers per Division 01 specifications as required to completely isolate construction activities from the unaffected areas of the building via a sealed envelope of plastic walls and ceilings and the utilization of air scrubbing devices; the temporary capping or bypass plumbing fixtures installations as required to keep the upper, lower, and adjacent restrooms and related fixtures operational during all construction phases during normal business hours. New walls and floor penetrations are to receive new firestopping to contain smoke and flame spread through these openings and maintain current fire ratings. Existing firestopping damaged or dislodged during work shall be repaired to meet currently adopted codes and standards. Contractor must adhere to the Project Phasing Plan incorporated within the Project Documents and prepare a detailed project schedule of activities accordingly. Work Hours: The General Contractor will perform construction activities during the following items: Sunday through Saturday starting from 6:00 PM to 6:00 AM. All dates and times will be outlined in the project schedule as required per Section 01 32 16. The contractor shall notify the Owner’s Representative when changes to the submitted working days/hours are deemed necessary.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents