Similar Projects
Middle School - 2022 Bond - Hemlock Public School District
Renovation, Infrastructure
Design
$5,000,000 CJ est. value
Hemlock, MI 48626

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Bridge Rehabilitation Including Epoxy Deck Overlay, Deck Patching and Sidewalk Repairs on Johnson Street
Demolition, New Construction, Infrastructure
Bidding
$511,000 CJ est. value
Saginaw, MI 48607

Swan Valley School District Auditorium & Learning Center Addition
Addition, Renovation, Infrastructure - 35,940 SF
Sub-Bidding
$8,000,000 CJ est. value
Saginaw, MI 48609

SISD Millet Learning Center - Playground Improvements
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Saginaw, MI 48601

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Asphalt Paving
Infrastructure
Post-Bid
Hemlock, MI 48626

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Streets Improvement Project
Results
Chesaning, MI

Shields Elementary School - 2021 Bond - Swan Valley School District
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Saginaw, MI 48609

Havens Elementary School - 2021 Bond - Swan Valley School District
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Saginaw, MI 48609

Sanitary Sewer System Improvements
New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
Tittabawassee Township, MI 48623

New Comprehensive High School Deep Foundations
Infrastructure
Post-Bid
Saginaw, MI

Building and Site Improvement Plans - Save-A-Lot
Infrastructure
Results
Saginaw, MI 48601

Lake Huron Environmental Sciences Research Station - Saginaw Valley State University
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Saginaw, MI 48604

Last Updated 01/03/2023 01:05 PM
Project Title

RFP Engineering - Tittabawassee Road Curve Road to the Tittabawassee River

Physical Address View project details and contacts
City, State (County) Tittabawassee Township, MI 48623   (Saginaw County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Saginaw County Road Commission (SCRC) is requesting proposals for Engineering Services for the design of a Federal Aid Project within Saginaw County. For scheduling purposes and a design timeline, the project should be submitted to the Michigan Department of Transportation in anticipation of December 2024 letting date. This Road project includes the design of approximately 2.5 miles of roadway improvements through Saginaw County. Tittabawassee is a two-lane Major collector carrying approximately 5700 vehicles per day west of River Road and 9100 Vehicles per day east of River Road. The road is intended to be an all-season route funded with a variety of sources. The project shall be designed according to 3R/4R standards and in accordance with a typical MDOT Federal-Aid project. Our vision of the project is to resurface the roadway and provide 4' paved shoulders west of River Road and 6' paved shoulders east of River Road. This project is intended to profile mill the surface and overlay the roadway with 3.5" of HMA. The paved shoulders will be placed over existing gravel shoulders. A Roundabout will be added at the intersection of Tittabawassee and River Roads. Full design plans will be needed for the roundabout intersection. Most of the roadwork can be designed and set up as a log job. We anticipate needing easements to construct the roundabout. The consultant will need to provide legal descriptions and drawings for these locations. The Road Commission will be responsible for getting the additional right of way. The Saginaw County Road Commission, through its MPO has allotted a construction budget of $1,000,000 for the road project and $950,000 for the roundabout project. The design shall follow a critical path to meet a proposed letting date no later than December 2024. The estimated start of construction likely be May 2025. Award of the contract will be on or near February 28, 2023 The method of contractor selection has not been determined at this time

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents