Similar Projects
Metropolis Theatre Flooring Replacement
Bidding
Arlington Heights, IL

Des Plaines Boardroom Expansion/Renovation Athletic/Theater Wing Flooring Replacement
Term Contract
Bidding
Arlington Heights, IL

Theatre Concrete Polishing and Terrazzo Installation
Post-Bid
Des Plaines, IL 60016

Classroom Flooring at McCracken MS & Middleton ES
Post-Bid
Skokie, IL 60076

Kitchen Floor Tile Replacement at Ogden Elementary School
Results
Chicago, IL 60610

Lincolnwood SD 74 Rutledge Hall Flooring Replacement
Results
Lincolnwood, IL

CPS Marshall Gym Floor Repair
Term Contract
Bidding
Chicago, IL

Don Preston Gym Replacement Floor
Post-Bid
$200,000 est. value
Midlothian, IL 60445

Hardwood Synthetic Sports Flooring
Post-Bid

Flooring Replacement - Phase I
Post-Bid
Less than $1,500,000 est. value
Chicago, IL 60601

Replace Flooring
Post-Bid
Less than $600,000 est. value
South Holland, IL 60430

Flooring at Lakeview High School
Post-Bid
Chicago, IL 60613

Ahlstrand Flooring
Post-Bid
Hanover Park, IL 60133

Des Plaines Theatre Hardwood Flooring Installation
Post-Bid
Des Plaines, IL 60016

Athletic Flooring at Buffalo Grove and Elk Grove High Schools. District 214
Post-Bid
Arlington Heights, IL

Last Updated 05/19/2021 08:25 AM
Project Title

CPS Otis ES Hallway Tile Replacement

Physical Address View project details and contacts
City, State (County) Chicago, IL 60642   (Cook County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide Labor and Materials to: 1)Replace floor tile on the 2nd and 3rd floor hallways as indicated in project drawings T1.0 and S1.0. 2)Contractor to field verify dimensions and specifics of all before placing bid. 3)Not responsible for contractor errors as a result of non-field verification. 4)Materials and installation must comply with CPS Standards and Specifications as listed on a)09 65 00 RESILIENT FLOORING 5)Secure job site overnight if work is not completed in one day. 6)If building or CPS properties are damaged during construction, replace and/or repair as necessary. 7)All questions/requests must be received 2 business days, prior to bid closing. 8)All work shall be coordinated with the Board authorized representative to complete in an agreed upon timeframe. 9)Clean the surrounding area and make sure all is swept of debris and excess mortar. 10)All trash must be removed offsite by vendor and area left clean.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents