Similar Projects
Request for Information-Live, Virtual and Constructive - Integrating Architecture (LVC-IA)
Design
Orlando, FL 32826

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

RFP - Connectivity Master Plan and Smart City Initiative Consultant Services
Term Contract
Bidding
Winter Park, FL 32789

RFQ Design - Architectural and Engineering Services for Ocoee Middle School Comprehensive Renovation Project
Renovation
Bidding
$25,000,000 CJ est. value
Ocoee, FL 34761

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Engineering, Planning and Development
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Performing Arts Complex Phase II
Design
Orlando, FL 32816

RFQ - Architectural Continuing Services
Term Contract
Bidding
Orlando, FL 32801

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

RFQ Design - Architectural and Engineering Services for FY22 Multi-Site Comprehensive Renovation Project
Renovation
Bidding
$63,000,000 CJ est. value
Orlando, FL 32801

Architect and Engineering Services for Production Technical Services (PTS) for FEMA's Risk MAP Program
Post-Bid
$10,000 to $300,000,000 est. value

Architect-Engineer Supplemental Services - Southeast Regional Office
Results

Last Updated 08/29/2022 09:01 PM
Project Title

RFP Design - Design Consultant Services for SR 534 Segment 3 East of Jim Branch Creek to SR 15 (Narcoossee Road)

Physical Address View project details and contacts
City, State (County) Orlando, FL 32822   (Orange County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Central Florida Expressway Authority (CFX) requires the services of Professional Engineering Consultants to prepare construction drawings / specifications for the construction of SR 534 from east of Jim Branch Creek to SR 15, identified as "Segment 3''. Shortlist consideration will be given to only those firms who are qualified pursuant to law, and as determined by CFX, based on information provided by the firms, and who have been prequalified by FDOT to perform, as a minimum, the indicated Major Types of Work. Firms are advised that requests made for project information and files must be made through the CFX Contact Person shown below. Any violation of this requirement will be grounds for rejection of a submittal made in response to this notice. MAJOR TYPES OF WORK: As a minimum, the Consultant shall be prequalified by FDOT in the following work types: 3.2 Major Highway Design, and 3.3 Controlled Access Highway Design. Disadvantaged/Minority/Women/Business Enterprises will not be discriminated against on the basis of race, color, sex, or national origin in consideration for qualification or an award by CFX. CFX has established a 20% participation objective for D/M/WBE firms for each project. The Method of Contractor Selection has not been determined at this Time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents