Similar Projects
RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Brundage Estates Residential Subdivision
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Meridian, ID 83642

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Blue Sky Orchard Water Production Well
Infrastructure
Bidding
$2,000,000 CJ est. value
Boise, ID 83702

Gorilla Mind Warehouse & Office
New Construction, Infrastructure - 39,500 SF
Bidding
$5,000,000 CJ est. value
Meridian, ID 83642

Dust Abatement Dirt Roads
Term Contract
Post-Bid
Dixie, Elk City, Meridian, ID 83525

Prime Earth Pit Reclamation
Infrastructure
Post-Bid
Eagle, ID 83616

Capital Maintenance Phase Two
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

Capital Maintenance, Phase 3, ACHD, Boise Area
Infrastructure
Results
$500,000 to $1,000,000 est. value
ID

ICCU Downtown Tower
New Construction, Infrastructure
Pending Verification
$73,000,000 CJ est. value
Boise, ID 83702

Idaho Street Mixed-Use Building
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Boise, ID 83702

Amity Road and Maple Grove Road Roundabout - Ada County Highway District
Infrastructure
Conception
$652,000 CJ est. value
Boise, ID 83709

Julia Davis River Node Memorial Construction
Infrastructure
Design
$600,000 CJ est. value
Boise, ID 83702

Vehicle Storage Building
New Construction, Infrastructure
Bidding
$850,000 CJ est. value
Eagle, ID 83616

Last Updated 09/20/2022 09:34 AM
Project Title

Ada County Landfill North Ravine Cell Topsoil Stripping

Physical Address View project details and contacts
City, State (County) Garden City, ID 83714   (Ada County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $556,147 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be included in the Construction Contract is generally described as: Providing all materials, equipment, and labor for stripping, hauling, and stockpiling 4-feet of topsoil from approximately 8-acres of the landfill soil borrow area, and building an unpaved equipment access road approximately 1,000-feet long by 20-feet wide, located at the Ada County Landfill North Ravine Cell, 10300 Seaman's Gulch Road., Boise, Idaho 83714, as more specifically detailed in the Project Manual specifications and drawings. Questions Due Date Online Portal Deadline to submit Questions Apr 22nd 2022, 4:00 PM MDT

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents