Similar Projects
Mastodon Lake Dredging and Shoreline Restoration
Infrastructure
Design
$100,000 CJ est. value
Aurora, IL 60506

Sauk Valley Community College 2022 Abatement Project - West Toilet Rooms
Term Contract, Demolition, Infrastructure
Sub-Bidding
$79,600 CJ est. value
Dixon, IL 61021

Demolition of 3638 Rosemear Avenue
Demolition, Infrastructure
Sub-Bidding
$98,000 CJ est. value
Brookfield, IL 60513

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

Central Dietary - Asbestos Work
Renovation
Results
Less than $150,000 est. value
Elgin, IL 60123

Asbestos Abatement Services
Term Contract
Results
$17,250 to $39,650 est. value
Galesburg, IL

River Forest Buildings Demolition Project
Demolition, Infrastructure
Sub-Bidding
$113,000 CJ est. value
River Forest, IL 60305

Asbestos Abatement at Indian Creek High School
Post-Bid
Shabbona, IL 60550

Asbestos Abatement at 2306-2308 and 2312 5th Avenue
Results
Moline, IL 61265

Lorden Building Demolition at Davis Park
Demolition, Infrastructure
Sub-Bidding
$10,000 CJ est. value
Rockford, IL 61101

Asbestos Abatement
Renovation
Post-Bid
Oak Forest, IL 60452

CPS Talcott Elementary School ACM Abatement
Results
Chicago, IL 60622

Winnebago County Health Department (WCHD) Demolition and Debris Removal - 801 Waveland Avenue
Demolition, Infrastructure
Sub-Bidding
$30,000 CJ est. value
Rockford, IL 61102

Asbestos Abatement
Post-Bid
Calumet City, IL 60409

Last Updated 08/25/2022 12:33 PM
Project Title

Asbestos Abatement for 2022 Flood Restoration at Ridgeview High School and Junior High School

Physical Address View project details and contacts
City, State (County) Colfax, IL 61728   (McLean County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Ridgeview S.D. 19 will receive sealed bids for Asbestos Abatement for 2022 Flood Restoration at Ridgeview High School and Junior High School, 202 E. Wood Street in Colfax IL 61728. The work is to remove insulation from boiler room from floor up to approximately six feet above the floor, including 90 square feet of boiler insulation, 50 linear feet of asbestoscontaining pipe insulation, 300 inear feet of fiberglass pipe nsulation and 50 fittings, utilizing gross removal methods and remove floor tile and associated mastic (approximately 10,000 square feet) from throughout the basement utilizing rion-friable removal methods, including grinding floor after removal The Date of Commencement is September 26, 2022. The Date of Substantial Completion is October 7, 2022,

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents