Similar Projects
45th Street Watermain Extension - W-036 - City of Elmo
Infrastructure
Conception
$400,000 est. value
Lake Elmo, MN 55042

New or Refurbished Ballfields - PR-017 - City of Elmo
Infrastructure
Conception
$1,000,000 CJ est. value
Lake Elmo, MN 55042

Radio Drive to Interlachen Parkway / Woodbury
Infrastructure
Design
$2,425,856 CJ est. value
Woodbury, MN 55125

Radio Drive to Interlachen Parkway / Woodbury
Infrastructure
Design
$2,425,856 CJ est. value
Woodbury, MN 55125

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Norell Avenue North Improvements
Infrastructure
Post-Bid
Oak Park Heights, MN 55082

Norell Avenue North Improvements
Infrastructure
Post-Bid
Oak Park Heights, MN 55082

Highway 36 and Manning Avenue Interchange
Results
MN

2021 Pavement Improvements
Infrastructure
Results
Forest Lake, MN

Cornerstone Village Apartments
New Construction
Construction
$1,680,000 est. value
Oakdale, MN 55128

Metro Gold Line Bus Rapid Transit (GBRT)
New Construction, Infrastructure
Construction
$247,954,230 CJ est. value
Saint Paul, MN 55101

RFP Design - Lake Elmo Park Reserve Swim Pond Recreation Area Improvements
New Construction, Infrastructure, Renovation
Pending Verification
$4,390,000 CJ est. value
Lake Elmo, MN 55042

RFP Design - Lake Elmo Park Reserve Swim Pond Recreation Area Improvements
New Construction, Infrastructure, Renovation
Pending Verification
$4,390,000 CJ est. value
Lake Elmo, MN 55042

Central Greenway Regional Trail - PR-009 - City of Elmo
Infrastructure
Conception
$220,000 CJ est. value
Lake Elmo, MN 55042

Last Updated 03/02/2023 05:16 PM
Project Title

CSAH 5 Phase 2

Physical Address View project details and contacts
City, State (County) Stillwater, MN 55082   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,201,422 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Major Quantities include: Remove Curb & Gutter 11,233 Lin Ft, Remove Concrete Walk 3,441 Sq Yd, Excavation-Common 6,891 Cu Yd, Aggregate Base (CV) Class 5 4,007 Cu Yd, Mill Bituminous Surface (2.0") 20,190 Sq Yd, Type 12.5 Bituminous Mixtures 7,047 Ton, RC Pipe Sewer Des. 3006 (12"-18") 1,241 Lin Ft, Const. Drainage Structure Des. 48-4020 122 Lin Ft, Concrete Walk (4"-6") 50,504 Sq Ft, Concrete Curb & Gutter 10,604 Lin Ft, 6" Concrete Driveway Pavement 1,693 Sq Yd, Truncated Domes 1,102 Sq Ft, and Sign 383 Sq Ft, 4" Solid Line Multi. Comp. Gr. In. (WR) 11,905 Lin Ft. B1803599, 20-10509, 2019-09

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents