Similar Projects
Indefinite Delivery/Indefinite Quantity Construction Multiple Award Task Order Contract
Design
$500,000 to $90,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Design

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Post-Bid
Less than $95,000,000 est. value

(MATOC) for Construct throughout New England
Post-Bid
Less than $90,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Job Order Contracts (JOC) Region B
New Construction, Renovation
Results
$10,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Sources Sought Notice for Design-Bid-Build (DBB), Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Facilities in the North Area of Responsibility (AOR)
Post-Bid

Firm fixed price (IDIQ) (MATOC), for Paving at Military and other Federal Facilities throughout New England
Results
$100,000 to $2,000,000 est. value

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

D/B Northeast MATOC
Post-Bid
$1,000,000 to $250,000,000 est. value

Last Updated 06/23/2020 09:21 AM
Project Title

Finance Office Renovations and Town Manager's Office Renovations

Physical Address View project details and contacts
City, State (County) Storrs, CT 06268   (Tolland County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $49,670
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work is, but not limited to, the following: -Demolition, installation of doors and windows, electrical work, HVAC work, and painting. - Provide all labor, materials, and equipment necessary to complete the work as shown and specified on the drawings. - The Contractor shall be responsible for all trash removal during construction. - The Contractor shall protect any existing materials that are to remain. - The Contractor shall schedule work so as to avoid disruption of other building department offices and their visitors. - All materials shown are new unless otherwise noted on the drawings. - All required permits shall be obtained and paid for by the selected contractor. - Carpeting in the Finance Office shall be coordinated and done by others.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Acoustical Ceilings, Painting and Coating, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents