Similar Projects
Construction of Water Supply Improvements (Contracts A and B)
Bidding
$1,776,958 est. value
Dickinson, AL

Highway 11 AC Main Replacement
Infrastructure
Bidding
$800,000 est. value
Tuscaloosa, AL 35407

Construction of Highway 95 and 58 12" Water Transmission Main
Post-Bid
Columbia, AL 36319

Kitchen Equipment
Post-Bid
Montgomery, AL

Highway 31 Water and Sewer Improvements
Results
Less than $96,050 est. value
Clanton, AL 35045

UBT Western Gateway Water Improvements
Results
Less than $229,891 est. value
Tuskegee, AL

Mitchell Water System - Jim Jones Road Water Main Improvements
Infrastructure
Bidding
$400,000 est. value
Cottondale, AL 35453

Purchase Two (2) Laboratory Fume Hoods
Post-Bid
Mobile, AL

Western Water Transmission Main Phase 2
Results
Madison, AL

Electrical Equipment
Alteration
Bidding
Birmingham, AL

Equipment Trailers
Post-Bid
Mobile, AL

Meter Changeout Program
Results
Huntsville, AL 35811

Electrical equipment
Alteration
Bidding
Birmingham, AL

Building Materials
Post-Bid
Huntsville, AL

Contract No. 1 - Water Distribution Mains
Results
Less than $510,000 est. value
Notasulga, AL

Reported 07/14/2022 12:00 AM
Project Title

Material Bid - South Barrons Bridge Road Area Project

Physical Address View project details and contacts
City, State (County) Dadeville, AL 36853   (Tallapoosa County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Equipment, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The material bid has been divided into four (4) major sections. The sections are described as follows: 1. Pipe 2. Fire Hydrants and Valves 3. D.I. JM Compact Fittings and Accessories 4. Service Materials The Owner will award the project based upon the lowest responsive, responsible bidder on the total bid of Section Nos 1 - 4.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents