Similar Projects
Lansdowne SPS Reliability Upgrades
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Leesburg, VA 20176

Replace Two (02) Custom Exterior Doors at the Property at 2731 Chestnut Street New Orleans, La 70115
Renovation
Sub-Bidding
$80,000 CJ est. value
Portsmouth, VA 23709

On-Call Plumbing/Sewer And Drain Services
Term Contract
Post-Bid
Lynchburg, VA

ARPA Leak Detection Services
Term Contract
Post-Bid
Richmond, VA

James River Visitor Center, VA, Plumbing & Well Protection
Results
$25,000 to $100,000 est. value
Monroe, VA 24574

Plumbing Services
Alteration
Results

Chiller By-Pass Piping
Term Contract
Post-Bid
Richmond, VA 23249

Chemical Pond Pumping- Gainesville
Term Contract, Alteration
Results
VA

Roof Drain at Scope Arena Unclogging and Cleaning Services
Alteration
Post-Bid
Norfolk, VA

Plumbing Services
Term Contract
Results
VA

Private Water Well At Halifax, Va
Renovation, Infrastructure
Post-Bid
Halifax, VA 24558

Plumbing
Alteration
Results
Manassas, VA

Fort Lee Backflow Installation Testing and Services
Term Contract
Post-Bid
Fort Lee, VA

York River System Isolation Valve Installation and Replacement
Infrastructure
Results
$6,874,630 CJ est. value
Hampton, VA 23669

Plumbing Maintenance and Repair Services at Norfolk Naval Shipyard, Portsmouth, Virginia AOR
Term Contract, Alteration
Post-Bid
Less than $800,000 est. value
Portsmouth, VA 23709

Last Updated 05/09/2023 12:02 AM
Project Title

S. King Street Area Improvements- Phase 1 Waterfront Improvements

Physical Address View project details and contacts
City, State (County) Hampton, VA 23669   (Hampton City County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,079,380 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Hampton is seeking bids from qualified bidders to provide for the construction of bulkhead repairs and a new wood pier as shown on the S. King Street/Rudd Lane Area Improvements-Phase 1 Waterfront Improvements Plan Set Contractor agrees that it shall perform services as specified in this ITB. The Contractor further agrees it will furnish all labor, equipment, and material necessary to perform all Work in accordance with the requirements and provisions of the Contract as defined in the General Terms and Conditions. Work shall mean the furnishing of all labor, materials, equipment, and other incidentals necessary to the successful completion of the Contract and the carrying out of all duties and obligations imposed by the Contract Extra Work shall mean such additional labor, materials, equipment, and other incidentals, not shown on the drawings or called for in the specifications, but authorized by the City in writing as an addition to that Work called for in the Drawings and Specifications. All questions regarding this solicitation shall be submitted in writing to tmartin@hampon.gov by no later than 4:30 PM EST on April 18, 2023. Questions must be submitted in writing; telephonic inquiries will not be considered. Minorities (MBE) 4.34% Non-minority women (WBE) 3.82% Completion- 240 calendar days

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents