Similar Projects
Repair/Maintain Airfield Stormwater System Phs II, FGWB 04-0014P2A and FGWB 04-0014P2B
Design
$5,000,000 to $10,000,000 est. value
Marietta, GA

Stormwater Utility On-Call Contractors
Post-Bid
Duluth, GA

Replacement of Storm Piping
Post-Bid
Macon, GA 31200

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

FY 2018 Water Main Improvements Project
Results
Less than $2,000,000 est. value
Gainesville, GA

New Dunbar Road Regional Stormwater Facility
Post-Bid
Byron, GA 31008

Green Infrastructure Design Challenge - Continental Colony Elementary
Results
Atlanta, GA 30331

FGWB 14-0014P2A, Maintain Airfield Stormwater System Phase II & FGWB 14-0014P2B Repair Stormwater System Phase II
Post-Bid
$5,000,000 to $10,000,000 est. value
Marietta, GA

FY 2018 CDBG
Results
Less than $1,397,324 est. value
Cornelia, GA

Railroad Avenue - CDBG 2016 - Storm Sewer and Roadway Improvments
Post-Bid
Cochran, GA 31014

Concrete Pipe
Results
GA

1291 Creek Wood Cove Storm Drain Replacement Project
Post-Bid
Lawrenceville, GA 30046

Edgehill Place Storm Drainage Repair
Results
Johns Creek, GA

Prequalified Contractors List
Post-Bid
East Point, GA

Lakeland Avenue Storm Pipe Repair
Results
Valdosta, GA

Reported 11/06/2019 12:00 AM
Project Title

241-301 Hanarry Drive (North) Storm Drain System Replacement Project

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed by the General Contractor consist of but is not limited to the following major items: Demolition and removal of existing 48” - 60” CMP storm drain pipe system. Replace & Install 726’ HDPE 48” Pipes and tie-in to existing structures. Replace & Install 115’ HDPE 60” Pipes and tie-in to existing structures. Installation of D/I‘s- 8'-12' deep Installation 24" curb & gutter. Installation of sod/mulch on areas disturbed by construction activities . Installation of erosion control BMP’s. Re-grout all exist. structures & site clearing. Re-set existing Pre-cast Headwalls and install fresh Rip Rap.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents