Similar Projects
Last Updated | 11/07/2019 07:46 PM |
Project Title | FDOT HVAC Install: Sneads WB Weigh Station |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: FL |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide sufficient work force, equipment, materials, oversight, shop drawings, permitting, safety, clean-up, and all incidentals necessary to install a fully integrated and functioning HVAC system as depicted and specified in the Scope of Services, Contract Plans, and Specifications Manual. Work includes: replacement of existing constant air DX split AC/Heat pump systems, Thermostats, refrigeration piping, and all electrical rework, ductwork modifications, and incidentals required for equipment installation. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |