Similar Projects
BCEC BMS and HVAC Upgrade - General Bids
Bidding
Boston, MA

Up Academy Unit Ventilator Replacement
Bidding
Less than $2,112,917 est. value
Boston, MA

Doris Bunte RAD Conversion - Filed Sub Bids
Sub-Bidding
Boston, MA

Street Botolph RAD Conversion - Filed Sub-Bid
Sub-Bidding
Boston, MA

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Bajko Rink Addition - Filed Sub Bid
Post-Bid
Hyde Park, MA 02136

Heating and Domestic Water Systems Upgrades - Phase I at Franklin Field Development - General Bids
Results
Less than $2,592,791 est. value
Dorchester, MA

Heating and Domestic Water Systems Upgrades - Phase I at Franklin Field Development - Sub Bids
Results
Less than $2,592,791 est. value
Dorchester, MA

HVAC Upgrades - Hospital Operating Rooms - Filed Sub-Bids
Post-Bid
$325,000 est. value
Jamaica Plain, MA

Boiler Replacement at the Charles Sumner and Maurice J. Tobin Schools - General Bids
Results
$22,368,470 est. value
Roslindale, MA 02131

HVAC Upgrades - Hospital Operating Rooms - General Bids
Post-Bid
$325,000 est. value
Jamaica Plain, MA

Boston AC Maintenance & Repair
Results
Boston, MA 02210

Furnish and Deliver Two 30-ton Condensing Units RCS030D
Post-Bid
Boston, MA 02129

Replacement of Air Handlers
Results
Boston, MA

Anti-Ligature Upgrades at Lemuel Shattuck Hospital - Sub Bid
Post-Bid
Boston, MA 02130

Last Updated 12/26/2018 10:37 AM
Project Title

Boiler Replacement East Boston High and Hugh O'Donnell Schools - General Bids

Physical Address View project details and contacts
City, State (County) East Boston, MA 02128   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,950,030
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description DCAMM Certification Required. Project Location: East Boston High - 86 White Street, East Boston, MA 02128 O'Donnell School - 33 Trenton Street, East Boston, MA 02128 The scope of work is further detailed in the specifications and includes the following: Boiler replacement and associated work at the East Boston High and Hugh O'Donnell Schools related to the 2017 Massachusetts School Building Authority (MSBA) Accelerated Repair Program (ARP).
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents