Similar Projects
2022 Resurfacing Project
Infrastructure
Bidding
$410,000 est. value
Lincolnwood, IL

2022 Resurfacing Project
Infrastructure
Bidding
$410,000 est. value
Lincolnwood, IL

2021 Summer Paving
Post-Bid
Buffalo Grove, IL

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

Crack and Joint Sealing from Western Ave to Carrol Ave
Results
Harvey, IL 60426

(6.2-Mile) Cleaning and Sealing Longitudinal Cracks in the Existing Concrete Pavement
Results
Chicago, IL 60007

HMA Ssurface Removal and Resurfacing
Infrastructure
Bidding
$457,795 est. value
Lincolnwood, IL

Site Paving
Post-Bid
Elgin, IL 60120

Winnemac Rebuild Illinois Bonds and Alley Reconstruction
Results
Less than $305,000 est. value
Chicago, IL

Roadway Drainage Improvements
Infrastructure
Bidding
$150,000 est. value
Lemont, IL

2021 Sidewalk Program - CDBG
Post-Bid
Palatine, IL

Resurfacing, Curb and Gutter Replacement, Sidewalk Replacement and Pavement Markings on Oak Park Avenue from Roosevelt Road to North Avenue in Oak Park
Results
Oak Park, Tinley Park, IL 60477

Latonia Lane Pavement Rehabilitation
Infrastructure
Bidding
$3,841,000 est. value
Richton Park, IL 60471

Construction Various Width Pavement Resurfacing W/ Hot-Mix Surface Course Mix D, N50, 1-1/2" (184 Ton)
Post-Bid
Palos Heights, IL

Resurfacing Kenilworth Avenue from Green Bay Road to Sheridan Road in the Village of Kenilworth
Results
Kenilworth, IL 60043

Last Updated 05/05/2022 07:07 AM
Project Title

2022 Alley Improvements

Physical Address View project details and contacts
City, State (County) Chicago, IL   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes earth excavation, pavement removal, curb and gutter removal and replacement, PCC garage apron removal and replacement, PCC sidewalk removal and replacement, PCC alley pavement, storm sewer installation, edge grade adjustment, aggregate base course, type B, geotechnical fabric, hot mix asphalt seeding and fertilizing, construction videotaping and traffic control and protection.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents