Similar Projects
Air Compressor Preventative Maintenance
Term Contract
Bidding
Norfolk, VA

HVAC Unit Replacement at Hunton YMCA Auditorium
Post-Bid
$8,062 est. value
Norfolk, VA 23510

HVAC Preventive Maintenance and Repair Services
Term Contract
Post-Bid
Norfolk, VA 23510

Moores Bridges Water Treatment Plant HVAC Improvements
Results
$3,000,000 est. value
Norfolk, VA 23502

HVAC Preventative Maintenance and Emergency Service
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA

Regional Maintenance of Emergency Generators and HVAC Equipment
Post-Bid
Norfolk, VA

Emergency and Routine HVAC Maintenance and Repair
Results
Norfolk, VA 23510

HVAC Preventative Maintenance Services
Post-Bid
Norfolk, VA 23511

Air Handling Units and Outside Air Intake Plenum Refurbishment
Results
Norfolk, VA

Facility Sanitation HVAC Cleansing
Post-Bid
Norfolk, VA 23510

Maintenance and Repair Services on HVAC Direct Digital Control Systems
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA 23320

Air Compressor Preventative Maintenance
Post-Bid
Norfolk, VA 23510

Spong Hall - HVAC System and Building Envelope Upgrades
Results
$1,226,503 est. value
Norfolk, VA 23529

HVAC Services- DMV Norfolk-Widgeon Road CSC
Post-Bid
Chesapeake, Norfolk, VA 23513

Turnkey Heating, Ventilation, Air Conditioning, Boilers, Welding and Plumbing Services
Term Contract
Results
Norfolk, VA

Last Updated 11/09/2020 02:59 PM
Project Title

DFS Eastern Lab Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Norfolk, VA   (Norfolk City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $678,556
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Department of Forensic Science Eastern Laboratory is replacing two existing cooling towers located on the facility roof. The project area is approximately 8,370 GSF and the work includes demolition and replacement of two 650 ton cooling towers, their support platform, associated piping in the cooling tower well, and replacement of the cooling tower well roofing and insulation. Electrical work for the project includes reconnecting the cooling towers and their control devices and providing a new fused disconnect wired to the main service connection for connection of a temporary chiller. The scope of work also includes providing a temporary 300-ton air-cooled chiller to provide cooling for the facility while the cooling towers are unable to operate.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents