Similar Projects
Wastewater Pump Station - HS Ingredients
New Construction
Bidding
Cheraw, Chesterfield, SC 29520

Gravity Sewer Greenlawn Drive to Burnside 1 Pump Station Phase 2 (SS7258) CDBE
Infrastructure
Bidding
Columbia, SC

Woodside Pump Station Upgrade
New Construction
Post-Bid
North Charleston, SC 29405

Haddon House Pump Station Upgrade
Post-Bid
Less than $550,000 est. value
Richburg, SC

Pump Station 002 Replacement
New Construction
Results
Goose Creek, SC

Phase 2 - Kraft-Heinz Ground Storage Tank and Pump Station
Results
Newberry, SC

SIUC WWTP Effluent Storage and Pumping Improvements
Infrastructure
Bidding
Seabrook Island, SC

Central Plant Pump Station Motor Replacement
Post-Bid
Conway, SC 29526

Dunwoody Oaks Pump Station Elimination
Results
Greenville, SC

Rosewood and St. Stephens Pump Stations Upgrade
New Construction
Bidding
$700,000 est. value
Dillon, SC 29536

Pump Station 7 Repairs
Post-Bid
$100,000 to $300,000 est. value
Hollywood, SC 29449

South Greenville Enterprise Park Pump Station
Results
Greenville, SC 29673

Lake Rabon Raw Water Pump Station Surge Tank Improvements
Post-Bid
$600,000 to $700,000 est. value
Laurens, SC

Northside Drive Pump Station Elimination
Results
North Charleston, SC 29419

Plant Control Pump Station - Pump Base Improvements
New Construction
Post-Bid
Charleston, SC

Last Updated 06/30/2021 02:40 AM
Project Title

Upgrade Transfer Station Sewage Pump Station

Physical Address View project details and contacts
City, State (County) Myrtle Beach, SC   (Horry County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the demolition of the existing pump station, removal of existing pumps, installation of a new wetwell, new pumps, electrical work, force main lines, gravity sewer lines, storm drainage pipe, catch basins and all other required appurtenances to serve the new pump station at the site.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents