Similar Projects
RFQ Engineering - Professional Architectural and/or Engineering Services for Feasibility and Design of the Evergreen Woods Subdivision Wastewater
Infrastructure
Conception
$352,000 CJ est. value
Houston, TX 77002

Corporate Reconstruction - T-202100 - City of Houston
Infrastructure
Conception
$6,000,000 est. value
Houston, TX 77036

Storage Box West
New Construction, Infrastructure - 121,089 SF
Design
$7,900,000 CJ est. value
Houston, TX 77095

Freeway Manor South Area - M-410008 - City of Houston
Infrastructure
Design
$12,782,000 est. value
Houston, TX 77034

Mass Grading in Paradise Farms
Infrastructure
Bidding
$2,000,000 CJ est. value
Spring, TX 77373

Excavation, Spoil Disposal and Stormwater Outfall
Infrastructure
Bidding
$600,000 est. value
Houston, TX

Furnish Liquid Chlorine
Term Contract
Sub-Bidding
Baytown, TX 77520

Grease Trap and Lift Station Services
Infrastructure
Post-Bid
Pasadena, TX

Katy ISD Elementary School #46
Infrastructure - 137,674 SF
Post-Bid
$3,000,000 CJ est. value
Katy, TX 77449

Booster Pump Replacement
Results

Newport Pointe Lift Station Phase 1
Results
TX

Almeda & Orem RV Resort
New Construction - 4,448 SF
Construction
$3,700,000 est. value
Houston, TX 77045

East River Warehouse Offices Shell Buildings / East River Development
New Construction, Infrastructure - 30,000 SF
Pending Verification
$3,700,000 CJ est. value
Houston, TX 77020

Huntington Village Section 4 - City of Houston
Infrastructure - 4,600,000 SF
Pending Verification
$13,400,000 CJ est. value
Houston, TX 77099

Gray and Taft Area Paving and Drainage - N-210008 - City of Houston
Infrastructure, Alteration
Conception
$7,257,000 est. value
Houston, TX 77002

Last Updated 08/04/2022 11:38 PM
Project Title

Storm Water Pump Station to Serve Harris County Municipal Utility District No. 506

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,447,738 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Each Bid must be accompanied by a Bid Bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided, and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. If a certified or cashier's check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier's check within twenty-four (24) hours of receipt of the bid opening. By submitting a Bid, Bidder acknowledges and agrees that the Contract Documents may be accepted, executed or agreed to through the use of an Electronic Signature, as defined by and in accordance with Owner's Electronic Signature Rules for Construction Contracts. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents