Similar Projects
36-Inch Waterline Replacement
Infrastructure
Bidding
$500,000 est. value
Denver, CO

South Platte Water Quality Modeling
Post-Bid
Denver, CO

East Iliff Avenue and South Quebec Street Meter Vault Replacement
Infrastructure
Post-Bid
Denver, CO 80239

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Porteos Phase 8 (Segment 5) (Project)
Results
Denver, CO 80239

Water Advanced Metering Infrastructure Fixed Network System Phase II, Year 2022
Infrastructure
Post-Bid
CO

Transport Sub Area 1 Filing 1 Road and Utility Construction Project
Infrastructure
Results
Denver, CO

Water Meter
Term Contract
Post-Bid
CO

CO-Leadville NFH-Parking Lot Manhole Drain
Term Contract
Results
$25,000 to $100,000 est. value
Leadville, CO 80461

Denver Zoo West Water Main Project
Renovation, Alteration
Post-Bid
Denver, CO 80205

East 64th Avenue Improvements Himalaya to Picadilly
Infrastructure
Results
Denver, CO 80238

Water Line Improvements
Infrastructure
Results
Denver, CO

High Point 66th and 67th Avenue Project
Infrastructure
Results
Denver, CO 80249

Reported 05/13/2022 12:00 AM
Project Title

Lead Reduction Program Continuation

Physical Address View project details and contacts
City, State (County) Denver, CO   (Denver County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Denver Water is seeking to qualify multiple contractors based on capability and capacity to perform work on the Accelerated Lead Service Line Replacement (ALSLR) Project. The purpose of this Request for Qualifications (RFQ) is to pre-qualify and shortlist contractors to submit unit bid price proposals for work to be conducted in 2023. The ALSLR Project includes replacing customer-owned lead and galvanized water services in Denver Waters service area and performing verification potholing to confirm service line materials.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents