Similar Projects
Hot Mix Asphalt Cold Milling and Overlay and Pavement Markings on South Street
Infrastructure
Design
$852,026 CJ est. value
Jackson, MI 49201

McCoy Gun Range Improvements
Demolition, Renovation, Infrastructure
Bidding
Jackson, MI 49201

Transfer Center Driveway and Sidewalk Concrete Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Jackson, MI 49201

Northwest Elementary Classroom Addition
Addition
Post-Bid
Jackson, MI 49201

HS Storage Room Addition
Addition
Post-Bid
Jackson, MI 49201

Elementary Window Replacement/ Cafeteria Improvements And Middle School Boiler Replacement
Renovation
Results
$263,879 CJ est. value
Springport, MI 49284

Elementary Window Replacement/ Cafeteria Improvements And Middle School Boiler Replacement
Renovation
Results
$263,879 CJ est. value
Springport, MI 49284

Concord Elementary - 2022 Bond - Concord Community Schools
Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Concord, MI 49237

Concord Elementary - 2022 Bond - Concord Community Schools
Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Concord, MI 49237

Frost School Campus Redevelopment
Renovation, Addition
Post-Bid
Jackson, MI 49201

Seymour Road Drainage
Infrastructure
Results
$131,554 CJ est. value
Grass Lake, MI 49240

Middle School - 2022 Bond - Concord Community Schools
Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Concord, MI 49237

2019 Bond Projects - Western High School Additions and Renovations
Renovation, Addition
Post-Bid
Parma, MI 49269

Waste Water Treatment Plant SCADA Improvements
Renovation, Infrastructure
Results
$662,980 CJ est. value
Jackson, MI 49202

New STEM Center - 2022 Bond - Concord Community Schools
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Concord, MI 49237

Last Updated 11/28/2022 02:03 PM
Project Title

New Elementary School - 2022 Bond - Western School District

Physical Address View project details and contacts
City, State (County) Parma, MI 49269   (Jackson County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new 140,000 elementary school. A more detailed scope is expected to be released on a future date. As of November 28, 2022, this project is in the conceptual phase. The bond has been approved. Information regarding a design team and the contractor selection has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents