Similar Projects
2021 Bond Program
New Construction, Renovation
Conception
Phoenix, AZ

New Dysart Elementary School 1
New Construction
Conception
AZ

Two Head Start/Early Childhood Education Buildings
New Construction
Design
San Carlos, AZ

Construction Manager at Risk - East Valley Institute of Technology (EVIT) Main Campus Renovation
Renovation
Bidding
$590,000 est. value
Mesa, AZ 85201

Construction Manager at Risk - Capital Improvements Project at Kirkland Elementary School
Build-Out - 3,600 SF
Bidding
$4,500,000 est. value
Kirkland, AZ 86332

Replacement of Lukachukai Community School
New Construction - 104,024 SF
Post-Bid
Less than $58,000,000 est. value
Lukachukai, AZ 86507

Construction Manager at Risk - Elementary School No. 32
Post-Bid
Phoenix, AZ 85083

New Killip Elementary School
Results
Less than $19,500,000 est. value
Flagstaff, AZ 86004

Ash Fork School District Weatherization
Results
Less than $694,900 est. value
Ash Fork, AZ

Cross of Glory School Addition
Addition
Construction
$17,860 est. value
Peoria, AZ 85383

General Contractors for the Demolition, Renovations and New Space at Pima Elementary School
Renovation, Demolition
Construction
$3,850,000 est. value
Pima, AZ 85543

New Dysart Elementary School 2
Demolition
Conception
AZ

New Administration Building
New Construction
Bidding
$3,300,000 est. value
Phoenix, AZ

Kiva Elementary School Rebuild/Remodel
New Construction
Post-Bid
$18,500,000 est. value
Paradise Valley, AZ 85253

Festival Foothills Elementary School Repairs
Results
$1,232,227 est. value
Buckeye, AZ 85396

Last Updated 05/26/2022 03:14 AM
Project Title

Laguna Elementary School Renovations

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85705   (Pima County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors for Construction Manager at Risk (CMR) construction services for Laguna Elementary School Renovations (“Project”) located at 5001 N Shannon Rd, Tucson, AZ 85705. Design Phase Services by the CM @ Risk may include: 1. Provide detailed independent cost estimating and knowledge of marketplace conditions. 2. Provide project planning and scheduling. 3. Provide value engineering and constructability review. 4. Provide for construction phasing and scheduling that will minimize disruption on an occupied campus. 5. Advise District of ways to gain efficiencies in project delivery. 6. Provide recommendations on long lead procurements items and initiate procurement. 7. Select subcontractors/suppliers for this project per the subcontractor management plan submitted. 8. Coordinate project schedule with District, Architect, regulatory agencies. 9. Prepare GMP, provide all cost/estimating information to District. Construction phase services by the CM @ Risk may include: 1. Remodel the school space. 2. Coordinate with FWUSD, project management firm, civil engineer, architect, municipalities, utilities and sanitarian. 3. Arrange for procurement of material and equipment. 4. Schedule and manage site operations. 5. Projects based on open book. 6. Bid, award and manage all construction related contracts and subcontracts. 7. Provide quality control. 8. Bond and insure construction. 9. Meet all federal, state and local requirements. 10. Maintain a safe work site. 11. Deal timely and effectively with owner and architect issue.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents