Similar Projects
Trash Trappers for Toledo
Bidding
Toledo, OH

Asphalt Concrete, Bituminous Mixes, Equipment Rental, and Material Hauling
Term Contract
Post-Bid

Asphalt Concrete, Bituminous Mixes, Equipment Rental, and Material Hauling (MBE Bidders Only)
Term Contract
Post-Bid

Material Disposal
Results

Hauling , Beneficial Reuse or Processing of Lime Residuals
Results
Toledo, OH 43604

2020-2022 Sylvania Township Annual Household Pickup Service
Post-Bid
Sylvania, OH

2020-21 Spent Lime Removal and Disposal Project 1
Results
Less than $10,000,000 est. value
Toledo, OH 43604

Portable Chemical Restroom
Post-Bid
Toledo, OH

Construction and Demolition Debris Disposal
Term Contract
Results
Less than $500,000 est. value
Toledo, OH

Debris Removal and Hauling
Term Contract
Post-Bid
Toledo, OH

Disposal Services for Waste Oil
Results

Collect,Transport and Dispose of Tires
Post-Bid
Toledo, OH

2020 Water Treatment Plant Spent Lime Disposal Services
Results
Oregon, OH

2020 Leaf Pick Up
Post-Bid
Sylvania, OH 43560

Refuse Services, Multi-Site Ohio, Oh105
Results
Blacklick, Bryan, Chillicothe, Cincinnati, Columbus, Dayton, Delaware, Lima, Maineville, Milan, Monclova, North Canton, Sharonville, Trenton, Troy, Twinsburg, Whitehall, OH

Last Updated 11/03/2020 02:34 PM
Project Title

Airport Highway Roadway Resurfacing LUC-SR 2-13.79

Physical Address View project details and contacts
City, State (County) Toledo, OH   (Lucas County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will resurface 1.4 miles of pavement on Airport Highway between Byrne Rd. and South Street. This includes removing and replacing the pavement as well as pedestrian ramp improvements. The pavement width is approximately up to 40 feet. The asphalt is to be milled to a depth of up to 3.5" inches and replaced with a 2 inch asphalt intermediate course and a 1.5 inch asphalt surface course within the resurfacing area. The project also includes pavement striping, structure adjustments, and concrete pedestrian ramps where required

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents