Similar Projects
Veranda Townhomes Phase 2 Utilities and Paving
Bidding
TX

Streets, Sidewalk, and Concrete Pavement Repair
Post-Bid
League City, TX

Hot Mix Asphalt for City-Wide Street Repairs
Post-Bid
League City, TX 77573

Southern Region Disaster Recovery Support BPA
Results

Galveston County Road and Bridge Facility
Results
Dickinson, TX 77539

West Walker Traffic Improvement Phase II
Post-Bid
$334,202 est. value
League City, TX 77573

49th Street Improvements
Results
Less than $4,299,606 est. value
Galveston, TX

Water, Sanitary Sewer, Storm Sewer, and Paving to Serve Rainsong Section Three-B and Central Park Boulevard
Post-Bid
Texas City, TX 77591

73rd Street Reconstruction Heards Lane to Avenue N 1/2
Results
$1,300,000 est. value
Galveston, TX

Tiki Island Various Street Improvements
Post-Bid
Galveston, TX 77550

Asphalt Pavement Repair
Results
Less than $441,796 est. value
TX

Annual Asphalt Maintenance
Post-Bid
Galveston, TX

Texas Avenue Reconstruction
Results
Less than $4,322,000 est. value
Galveston, TX 77550

Construction of Water, Sanitary Sewer, Drainage and Paving to Serve Westwood Section 9
Post-Bid
League City, TX

27th Street Improvement Project Phase III
Results
$1,700,000 est. value
Galveston, TX 77550

Last Updated 12/20/2019 08:38 AM
Project Title

2019-2020 Street Maintenance Program

Physical Address View project details and contacts
City, State (County) Friendswood, TX 77546   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of, but is not limited to, the following tasks for various roads within the corporate limits of the City of Friendswood: 1. Removing and replacing 6” concrete paving. 2. Removing and replacing 6” concrete curb Types I and III. 3. Remove and replaces 6” concrete driveway. 4. Remove and replace 4” concrete sidewalk. 5. Install new 4” sidewalk. 6. Remove and replace wheel chair ramps. 7. Thermoplastic striping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents