Similar Projects
Arlington Boathouse - Arlington County
New Construction, Infrastructure
Conception
$18,695,000 CJ est. value
Arlington, VA 22209

Columbia Pike Library Replacement - Arlington County
New Construction, Infrastructure
Conception
$31,650,000 CJ est. value
Arlington, VA 22203

Joyce Motors Mixed-use Redevelopment / 10th and Irving
New Construction, Infrastructure - 185,000 SF
Design
$25,000,000 CJ est. value
Arlington, VA 22201

Joyce Motors Mixed-use Redevelopment / 10th and Irving
New Construction, Infrastructure - 185,000 SF
Design
$25,000,000 CJ est. value
Arlington, VA 22201

RFQ - Task Order Project Controls Support Services, Ronald Reagan Washington National Airport (DCA), Washington Dulles International Airport (IAD) and the Dulles Toll Road (DTR)
Term Contract
Bidding
$3,000,000 CJ est. value
Arlington, VA 22203

RFQ D/B - Pentagon Commercial Inspection Facility
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Arlington, VA 22202

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

ANC Road Construction
Results
$50,000 to $15,000,000 est. value
Arlington, VA

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

Atlantic Park Entertainment Venue
New Construction, Infrastructure - 70,400 SF
Construction
$45,000,000 CJ est. value
Virginia Beach, VA 23451

223 23rd Street Mixed-Use
New Construction, Infrastructure - 31 SF
Pending Verification
$125,000,000 CJ est. value
Arlington, VA 22202

223 23rd Street Mixed-Use
New Construction, Infrastructure - 31 SF
Pending Verification
$125,000,000 CJ est. value
Arlington, VA 22202

East Falls Church Metro Station Second Entrance - Arlington County
Addition, Infrastructure
Conception
$96,062,000 CJ est. value
Arlington, VA 22205

Bus Bay Expansion - East Falls Church Metro Station - Arlington County
Addition, Infrastructure
Design
$7,717,000 CJ est. value
Arlington, VA 22205

Last Updated 05/25/2023 10:02 AM
Project Title

Shirlington Road Pedestrian Bridge

Physical Address View project details and contacts
City, State (County) Arlington, VA 22206   (Arlington County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,384,239 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 25, 2023, the project has not been awarded. A timeline for award has not been confirmed. For the Provision of Capital Improvement Project Work to Consist of New Pedestrian Bridge Across Four Mile Run, Approach Trail, and Streetlights. Work Shall Include Construction of: Sidewalks, Accessible Ramps, Pavement Markings and Signage, Traffic Controls, Erosion And Sediment Controls, Related Site Work, and All Other Related Incidental Work Described and Required in the Contract Documents Questions Regarding the Original Solicitation Must Be Submitted by February 2, 2023, at 5:00 Pm Eastern Time to Be Considered for an Addendum. All Questions Received by the Question Deadline Will Be Responded to Within Vendor Registry and Posted for All Bidders. The System Will Not Accept Any Questions After This Date and Time Bid Surety in the amount of not less than 5% of the bid must be submitted with the bid. Performance and Payment Bonds in the amount of 100% of the award will be required of the successful bidder. Arlington County reserves the right to reject any and all bids, cancel this solicitation, and to waive any informalities or irregularities in procedure. A bidder's submission of a bid indicates acceptance of these terms

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents