Similar Projects
New Route 1 Elementary School
New Construction
Conception
$21,169,348 est. value
Fort Belvoir, VA

New Silver Line Elementary School
New Construction
Conception
$39,573,629 est. value
Herndon, VA

Design Services for Refurbishment of Norge Elementary School
Renovation
Design
Williamsburg, VA 23188

New Elementary School
New Construction
Design
Ashland, VA 23005

Job Order Contracting (JOC) - General Construction Services
Term Contract
Post-Bid
$5,000 to $200,000 est. value
Fredericksburg, VA

Macon And Joan Brock Classroom Art Installation
Renovation
Post-Bid
Virginia Beach, VA

Security Vestibule Renovations - Sterling Elementary School, Guilford Elementary School and Sully Elementary School
Renovation
Results
Sterling, VA 20164

Kitchen and Entrance Renovations to Key Elementary School
Renovation - 3,754 SF
Results
Arlington, VA 22201

Building Renovation at Douglas MacArthur at Taney Avenue
Renovation
Construction
Alexandria, VA

Hybla Valley Elementary School Renovation Project
Renovation - 93,000 SF
Construction
$36,595,929 est. value
Alexandria, VA 22306

Christian School
New Construction - 6,000 SF
Pending Verification
Elkton, VA

The Friends School
Renovation, Addition
Pending Verification
Virginia Beach, VA 23451

New Dunn Loring Elementary School
New Construction, Renovation
Conception
$36,800,000 est. value
Dunn Loring, VA

Dublin Elementary School Dishroom Renovation
Renovation
Post-Bid
Dublin, VA 24084

Burnley-Moran Elementary Media Center Modernization
Renovation - 4,052 SF
Results
$1,250,000 est. value
Charlottesville, VA 22901

Last Updated 08/23/2022 11:35 AM
Project Title

Norview Elementary School - Replace HVAC System - Norfolk Public Schools

Physical Address View project details and contacts
City, State (County) Norfolk, VA 23513   (Norfolk City County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,564,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Norview Elementary School - Replace HVAC System A detailed scope has not yet been determined This project is included in the city's 2022-2026 Capital Improvement Plan (CIP). As of August 23, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents