Similar Projects
RFP Design - Design and Construction of Mckee Run Control House
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Dover, DE 19904

Smyrna Farmers Market
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Smyrna, DE 19977

FY19 Inflow and Infiltration Project
Infrastructure
Design
$140,000 CJ est. value
Dover, DE 19904

North Duck Creek Water Tower
New Construction, Infrastructure
Bidding
$3,500,000 CJ est. value
Smyrna, DE 19977

North Duck Creek Water Tower
New Construction, Infrastructure
Bidding
$3,500,000 CJ est. value
Smyrna, DE 19977

Calvary Baptist Church / Dover
New Construction, Infrastructure - 27,000 SF
Post-Bid
$9,000,000 CJ est. value
Dover, DE 19904

Laboratory Expansion - Bid Package 2: Steel, Carpentry, General Work
Addition, Demolition, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Smyrna, DE 19977

Water Meter
Term Contract
Results
Dover, DE

2020 Streets Utility Project
Infrastructure
Results
Milford, DE

TPE DE NE91 Oak Lane Farm Solar
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Smyrna, DE 19977

Demolition of 33 South Queen Street
Demolition, Infrastructure
Design
$9,850 CJ est. value
Dover, DE 19901

College Road Pump Station Upgrade/Replacement
Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Dover, DE 19904

Heritage Elementary School Dehumidifier Installation
Post-Bid
Wilmington, DE 19808

Underground Utility Locating Services
Term Contract, Infrastructure
Results
Dover, DE

Demolish and Remove a Two-story Residential Structure and All Junk. Debris. Fences and Vegetative Overgrowth Located at 28 South Queen Street
Demolition, Infrastructure
Design
$11,800 CJ est. value
Dover, DE 19904

Last Updated 09/02/2022 07:31 PM
Project Title

North State Street Water Main Replacement

Physical Address View project details and contacts
City, State (County) Dover, DE 19901   (Kent County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,795,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Question deadline is June 7, 2022 If you have questions concerning this Intent to Bid, they must be made in writing and emailed to me at doverwhse@dover.de.us..The City of Dover reserves the right to request corrections, clarifications, and/or additional information pertaining to the bidder's response.The City of Dover shall have the right to reject any or all bids if deemed to be in the best interest of the City, such as but not limited to local vendor preference and minority vendor preference while awarding.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents