Similar Projects
Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

London Crossing
New Construction, Infrastructure - 32,600 SF
Design
$11,000,000 CJ est. value
Wheeling, IL 60090

Roadway Pavement Rehabilitation
Infrastructure
Post-Bid
Hoffman Estates, IL

Asphalt Parking Lot Removal & Replacement
Demolition, Alteration
Post-Bid
$300,000 est. value
Lansing, Tinley Park, IL 60438

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

2022 Sidewalk and Concrete Maintenance
Results
Palatine, IL 60067

The Obama Presidential Center
New Construction - 5,000 SF
Construction
$700,000,000 to $830,000,000 est. value
Chicago, IL 60637

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Foundry
New Construction, Infrastructure - 13,100 SF
Design
$163,000,000 CJ est. value
Chicago, IL 60607

153rd Street Resurfacing
Alteration
Post-Bid
Chicago, IL

McCook and Thornton Reservoirs Rock Wall Stabilization and Geotechnical Instrumentation
Renovation
Results
$8,460,000 to $10,250,000 est. value
Bedford Park, IL 60501

Auburn Park Station & Parking Facility
New Construction, Alteration - 4,678 SF
Construction
Chicago, IL 60620

Dialysis Care Center Western
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Chicago, IL 60620

Last Updated 02/13/2023 02:42 PM
Project Title

New Drive-up Window, Parking Lot Reconfiguration, and Interior Renovation Project

Physical Address View project details and contacts
City, State (County) Park Forest, IL 60466   (Cook County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Library - Public, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $299,000 [brand] Estimate
Plans Available from Architect - 11/16/22
Owner View project details and contacts
Architect View project details and contacts
Description

For the proposed New Drive-Up Window, Parking Lot Reconfiguration, and Interior Renovation Project Each complete bid (1 original + 2 copies) must be accompanied by a bid bond, cash, or a certified check payable to the order of the Park Forest Public Library, certified by a responsible bank for an amount not less than ten percent (10%) of the total amount of the bid, as a guarantee that the bidder, if awarded the Contract, will furnish a satisfactory performance and payment bond, execute a contract for the full scope of work, and proceed with and complete the work within the agreed upon project schedule. Upon failure to do so, the bidder shall forfeit the amount deposited as liquidated damages, and no mistakes or errors on the part of the bidder shall excuse the bidder or entitle them to a return of the aforementioned amount. No bid will be considered unless the bidder shall furnish evidence satisfactory to the Library Board of Trustees for the Park Forest Public Library that the bidder has the necessary facilities, abilities, experience, equipment and financial and physical resources available to fulfill the conditions of the Contract and execute the work, should the Contract be awarded to it. Bidders will examine the plans and specifications and also the location in which said work is to be done and judge for themselves all the circumstances and surrounding conditions affecting the cost and nature of the work, and all bids will be presumed to be based on such examination, familiarity and judgment. The Board of Library Trustees reserves the right to reject any and all bids, and to waive any technicalities and irregularities in the bidding and to hold the bid proposals for a period of thirty (30) days from the date of opening set forth above. The Board of Library Trustees reserves the right to accept the bid that is, in its judgment, the best and most favorable to the interests of the Library and to the public. The successful bidder will be required to comply with the provisions of all State of Illinois and federal laws concerning public works projects as well as the State of Illinois Human Rights Act and the regulations of the Illinois Human Rights Commission. In addition, the successful bidder will be required to comply with the Illinois Prevailing Wage Act. Completion date: September 1, 2023.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents