Similar Projects
PMI Paving - Taconic State Parkway, NY Route 217 to Interstate 90
Infrastructure
Bidding
$9,400,000 est. value
Austerlitz, Chatham, Ghent, NY

Cold Milling Work Order Contract
Term Contract, Infrastructure
Bidding

Road Paving
Term Contract
Post-Bid
Lagrangeville, NY 12540

Demolition and Disposal
Demolition
Post-Bid
Stanfordville, NY 12581

Access Road Rehabilitation - Phase 3 at Minnewaska State Park Preserve
Results
$2,295,000 to $3,105,000 est. value
Kerhonkson, NY 12446

On Demand Repairs to Thruway Infrastructure
Results

Tillson Avenue: Route 44/55(Vineyard Avenue) to Route 9w
Infrastructure
Bidding
Highland, NY 12528

Demolition of One Structure
Demolition
Post-Bid
Hunter, NY

Pavement Resurfacing Route 44 and 82
Results
Millbrook, Washington, NY 12514

Reclamation of County Roads
Term Contract
Post-Bid
Kingston, NY

Resurfacing: Two Segments of Route 52
Results
East Fishkill, Fishkill, NY 12524

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Pavement Resurfacing Route 299
Results
New Paltz, NY 12561

Demolition of Residential Structure
Demolition
Post-Bid
Hopewell Junction, NY 12533

Hot Mix Asphalt (HMA) Concrete In-Place
Term Contract
Results
Poughkeepsie, NY 12603

Last Updated 03/01/2022 08:07 AM
Project Title

System-Wide Toll Booth Removal and Roadway Rehabilitation

Physical Address View project details and contacts
City, State (County) (Columbia, Dutchess, Greene, Ulster Counties)
Category(s) Heavy and Highway
Sub-Category(s) Demolition, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Toll Booth Removal and Roadway Rehabilitation project. The scope of work for this project involves the removal of the existing toll booths at the Mid-Hudson Bridge in Highland, New York. Additional scope of work involves full depth highway reconstruction to reconfigure the toll plaza and approaches at the Mid-Hudson, Kingston-Rhinecliff and Rip Van Winkle Bridges.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Demolition.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents