Similar Projects
Last Updated | 09/28/2022 01:57 AM |
Project Title | Dove Lane 10 Inch Sanitary Sewer and Bluebird Lane Drainage Improvement Projects |
Physical Address | View project details and contacts |
City, State (County) | Red Oak, TX 75154 (Ellis County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The projects include construction of approximately 690 LF of 10-inch gravity sanitary sewer line and approximately 600 LF of 48-inch HDPP and RCP storm sewer line. The sanitary sewer line begins at an existing manhole at the southern end of Butterfly Lane and extends to the east along the southern side of Butterfly Lane to the south end of Bluebird Lane. The new gravity sewer will increase capacity for the existing sewer basin. The proposed storm sewer line begins at an existing 48" RCP storm water system outfall located at the back of the lot near 514 Bluebird Lane and will extends south and then west into a proposed 342 LF open channel which will terminate near the south end of Butterfly Lane at an existing unnamed creek. The new storm sewer line and open channel will improve drainage conveyance through the residential neighborhood. The deadline to ask questions is 9/23/2022 11:00 PM CST |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |