Similar Projects
SH 103 Culvert Replacement
Post-Bid
Idaho Springs, CO 80452

High Point Neighborhood Park West
Post-Bid
Denver, CO

2019 Bayfield Culvert Repair
Results
$200,000 to $300,000 est. value
Bayfield, CO 81122

Embankment Material
Results
CO

Detention Ponds Improvement Project
Post-Bid
Golden, CO

Installs Soldier Piles and Reinforced Facing Along A Cantilevered Concrete Retaining Wall That Was Undermined From North Clearcreek Scour
Results
Less than $1,000,000 est. value
CO

District Infrastructure To Service Solstice Filings 2-4
Post-Bid
Centennial, CO

Culvert Relining (Spray-Applied)
Results
Less than $1,000,000 est. value
CO

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Suckla #1 Reclamation
Results
Less than $25,000 est. value
Naturita, CO 81422

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

Pipe Supply for City Streets Division
Results
Grand Junction, CO 81501

Detention Pond Improvements
Post-Bid
Golden, CO

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

2020 Culvert Pipe Maintenance Services
Term Contract
Post-Bid
Brighton, CO 80601

Last Updated 02/25/2020 10:42 AM
Project Title

12-Inch Feeder Line Bijou Portion

Physical Address View project details and contacts
City, State (County) Fort Morgan, CO   (Morgan County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The major components of the project include: Total installation of approximately six thousand six hundred and twenty linear feet (6,620 L.F.) of piping, the total amount of pipe work is divided to the following sections: approximately 320 linear feet of 16" HDPE DR 7 piping directional drilled under the Bijou, installation of approximately 5,100 linear feet of open cut piping of which the owner is supplying approximately 4,200 linear feet of 12" C900 DR 14 PVC pipe for that portion of the project and there is an option to open cut and perform dewatering operations for approximately 1,200 linear feet along the lower portion of the Bijou drainage or the contractor may directional drill the piping in the lower portion of the Bijou drainage and not have to dewatered the majority of the length. There are two (2) connections to the existing waterline, installation of ARV vaults, fittings, seeding, erosion and sediment control, tree removal and various other items to allow the final product to be a fully functional system.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents