Similar Projects
Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School
Alteration
Design
$4,100,000 est. value
Lansing, MI 48933

Replace Chiller Plant Phase 2 (Construction) at the Oscar G. Johnson VA Medical Center Iron Mountain
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Iron Mountain, MI 49801

Walk-In Combination Cooler Freezer with Installation
Renovation
Sub-Bidding
$50,000 CJ est. value
Galesburg, MI 49053

Maloney Manor RoofTop Make-Up Air Modernization
Alteration
Post-Bid
Bay City, MI 48708

CBS HVAC Upgrade
Alteration
Post-Bid
Bay City, MI

Installation of Needlepoint Ionization Units
Alteration
Results
Lincoln, MI 48742

HVAC Controls Systems
Alteration
Results
Lansing, MI

Pool Dehumidification AHU Replacement
Renovation
Pending Verification
$2,200,000 CJ est. value
Allegan, MI 49010

Loy Norrix High School HVAC Improvements
Renovation - 368,436 SF
Sub-Bidding
$400,000 CJ est. value
Portage, MI 49002

MBMV 162418 Modernize DDC System
Term Contract
Post-Bid
Battle Creek, MI 49015

Lessenger Early Childhood HVAC Renovations
Alteration
Results
Oak Park, MI

Air Traffic Control Tower Chiller Replacement Project
Renovation
Sub-Bidding
$600,000 CJ est. value
Battle Creek, MI 49015

Energy Savings Performance Contract
Alteration
Post-Bid
Jonesville, MI 49250

Health Department Rooftop Unit Replacements
Alteration
Results
MI

South Elementary School 2023 Mechanical Upgrades
Renovation
Sub-Bidding
$500,000 CJ est. value
Ithaca, MI 48847

Last Updated 01/04/2023 10:33 AM
Project Title

Wyman Nursery - Office Boiler Replacement

Physical Address View project details and contacts
City, State (County) Manistique, MI 49854   (Schoolcraft County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $163,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of demolition of the existing boiler, air handling unit and associated components. Patching of exterior walls where equipment is being removed. Installation of new boiler, radiant tube heat and louvers. Electrical work associated with the new equipment and emergency shut offs for boiler in boiler room. Accepting Questions Until: Tuesday, October 18, 2022, at 12:00 P.m. (Last Addendum Will Be October 19, 2022.) All requests or inquiries concerning the Bidding Documents, or the Work must be addressed to: Tracie Williams, PE Tracie.Williams@ohm-advisors.com (906) 482-0535 A representative will be available to assist the Contractors. Other inspection visits may be allowed if needed. Individuals needing special services to fully participate in the meeting due to a disability may contact Alan Goschka at goschkaa@michigan.gov or 517-388-3489.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents