Similar Projects
Gaffin Road SE Improvements - 0000253 - City of Salem
Infrastructure
Conception
$2,900,000 CJ est. value
Salem, OR 97317

West Salem Wastewater Pump Station Improvements - 0001063 - City of Salem
Renovation, Infrastructure
Conception
$22,510,140 CJ est. value
Salem, OR 97301

Region 2 (Central and South) Curve Warning Upgrades
Infrastructure
Design
$1,692,760 CJ est. value
Silverton, OR 97381

I-5: N. Santiam - Kuebler
Infrastructure
Design
$6,469,100 CJ est. value
Salem, OR 97317

Aircraft Factory
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Portland, OR 97232

North Marion Transfer Station Concrete Repair 2022
Infrastructure
Bidding
$900,000 CJ est. value
Woodburn, OR 97071

Pringle Elementary School
Addition, Demolition, Alteration
Post-Bid
Salem, OR

Fire Hydrants
Infrastructure
Post-Bid
Salem, OR

Silver Creek Raw Water Line Installation Project
Alteration
Results
$2,800,000 est. value
Silverton, OR 97381

Brass Corporation Bends
Term Contract
Results
Salem, OR

Water Street Mixed Use
New Construction, Infrastructure
Pending Verification
$2,700,000 CJ est. value
Silverton, OR 97381

Water Main Replacement from Fairmount Reservoir North to Mission Street - 0000231 - City of Salem
Infrastructure
Conception
$4,900,000 CJ est. value
Salem, OR 97302

2022 Silverton Cured-in-Place Pipe (CIPP) Project
Infrastructure
Bidding
$500,000 CJ est. value
Silverton, OR 97381

Water Improvements Pavement Repair
Infrastructure
Post-Bid
$250,000 CJ est. value
Detroit, OR 97342

Brass Meter Adapters
Term Contract
Results
Salem, OR

Last Updated 08/22/2022 04:04 AM
Project Title

Waldo Avenue Southeast/Wildwind Drive Southeast - Pipe Rehabilitation - 0000223 - City of Salem

Physical Address View project details and contacts
City, State (County) Salem, OR 97301   (Marion County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $2,650,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design and construction of new 8-inch sanitary sewer mains on High St SE, Waldo Ave SE, and Wildwind Dr SE. Construction will allow for the abandonment of failing and unmaintainable sewer mains located in backyard easements between Wildwind Dr SE and Waldo Ave SE. As of August 22, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents