Similar Projects
Courthouse Flooring
Post-Bid
Safford, AZ 85546

Carpet, Tile and Luxury Vinyl Plank at Pima Residence Hall
Post-Bid
Tucson, AZ 85719

Bldg 20/21 Flooring
Results
Phoenix, AZ 85034

Emergency Carpet Replacement
Results
Teec Nos Pos, AZ 86544

Smith's Grocery Store #188
Construction
Lake Havasu City, AZ 86403

SFB Flooring Renovation
Post-Bid
Palo Verde, AZ 85343

Military Working Dog Kennel Lining
Results
Glendale, AZ 85309

SDFC Strength Equipment and Flooring
Post-Bid
Tempe, AZ 85287

Z--SODN - Replace Flooring and Hot Water Heaters
Results
Tucson, AZ

S201--SaniGlaze Floor Maintenance
Post-Bid
Phoenix, AZ 85012

Gym, Stage, Multi-Purpose Room and Sports Floors (New, Repair and Restoration)
Results
Kingman, AZ 86401

Public Works Building Flooring
Post-Bid
Chino Valley, AZ

Senior Center Flooring
Results
Chino Valley, AZ 86323

Electrical and Flooring Supply and Installation
Post-Bid
Glendale, AZ 85051

Maker Space Project for Various Schools Phase 2
Results
$150,000 to $200,000 est. value
Tucson, AZ 85704

Last Updated 12/29/2020 03:12 PM
Project Title

LRS Epoxy Floor (Vehicle Maintenance Bay)

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85034   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project renovates a Vehicle Mainenance Bay Floor B40 GOLDWATER AIR NATIONAL GUARD BASE PHOENIX ARIZONA. Remodel APPROXIMATELY 4,100 SQUARE FEET of the existing concrete floor. Current floor is concrete. Floor spalls repair and floor painting will be added to meet program requirements. The space being remodeled consists of MAIN VEHICLE MAINTENANCE BAY AND TANKER BAY floors B40 structural floor by repairing spalls as required, stripping and current sealant, and applying new oil and chemical resistant epoxy coating to the floor. Furnish all materials (FOB DESTINATION), labor, and tools, and supervision to perform project.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents